{"id":17872,"date":"2024-11-26T10:22:00","date_gmt":"2024-11-26T10:22:00","guid":{"rendered":"https:\/\/db-engineering-consulting.com\/?post_type=dbec_project&#038;p=17872"},"modified":"2026-01-19T10:22:46","modified_gmt":"2026-01-19T10:22:46","slug":"general-overhaul-of-the-riedbahn-rail-line","status":"publish","type":"dbec_project","link":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/","title":{"rendered":"General overhaul of the Riedbahn rail line"},"content":{"rendered":"\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-header-gallery  undefined--expanded\" data-delay=\"4\" data-auto-swipe=\"false\"><div class=\"gallery gallery--bullets-outside gallery--static\"><div class=\"glide\"><div class=\"glide__track\" data-glide-el=\"track\"><ul class=\"glide__slides\">\n<li class=\"wp-block-dbec-core-slide-header  glide__slide\" data-autoplay=\"false\"><div class=\"slide-header slide-header--banner-height\"><div><img loading=\"lazy\" decoding=\"async\" class=\"slide-header__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-2048x1365.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1280x853.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1920x1280.jpg 1920w\" alt=\"Track construction work, aerial view\" width=\"2560\" height=\"1707\"\/><div class=\"slide-header__cover\"><\/div><\/div><div class=\"label-reference-container\"><\/div><div class=\"slide-header__inner\"><div class=\"slide-header__center\"><div class=\"slide-header__container-headlines\"><\/div><\/div><\/div><\/div><\/li>\n<\/ul><\/div><div class=\"glide__footer\"><div class=\"glide__play-pause\"><button type=\"button\" class=\"glide__play-pause-button\" aria-label=\"play\/pause automatic swipe\"><svg aria-hidden=\"true\" class=\"controls__icon-pause\"><use xlink:href=\"#icon-pause\" \/><\/svg><svg aria-hidden=\"true\" class=\"controls__icon-play\"><use xlink:href=\"#icon-play-small\" \/><\/svg><\/button><\/div><div class=\"glide__bullets\" data-glide-el=\"controls[nav]\"><button class=\"glide__bullet\" aria-label=\"Go to slide 1\" data-glide-dir=\"=0\"><\/button><\/div><div><\/div><\/div><\/div><\/div><\/div>\n\n\n<nav class=\"breadcrumbs\"><div class=\"breadcrumbs__inner\"><a class=\"breadcrumbs__home\" href=\"https:\/\/db-engineering-consulting.com\/en\/\" aria-label=\"Link Home\"><svg class=\"breadcrumbs__home-icon\"><use xlink:href=\"#home\"><\/use><\/svg><\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg> <a data-is-distributor=\"true\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/\">Projects<\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><span class=\"breadcrumbs__actual-page\">General overhaul of the Riedbahn rail line<\/span><\/div><\/nav><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\"><div class=\"wp-block-dbec-core-social-sharing\"><div class=\"social-sharing\" data-subject=\"Here is an article for you: [TITLE]\" data-recipient=\"mail recipient en\" data-body=\"Here is an article by DB Engineering &#038; Consulting for you: [TITLE] at [LINK]\"><span class=\"social-sharing__label\">Share<\/span><div class=\"social-sharing__links\"><a class=\"social-sharing__link social-sharing__link--linkedin\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link LinkedIn\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-linked-in\"\/><\/svg><\/a><a class=\"social-sharing__link social-sharing__link--mail\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link Mail\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-mail\"\/><\/svg><\/a><\/div><\/div><\/div>\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-e1731594240163.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-300x198.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-1024x675.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-768x506.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-1536x1013.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-520x343.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-768x506.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-1280x844.jpg 1280w\" alt=\"Track relocation\" width=\"3277\" height=\"2160\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-relocation-e1731594240163.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-300x185.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-1024x631.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-768x473.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-1536x946.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-2048x1262.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-520x320.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-768x473.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-1280x788.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-1920x1183.jpg 1920w\" alt=\"Track construction work\" width=\"2560\" height=\"1577\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-construction-work-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"article-header\"><h1 class=\"article-header__headline\">General overhaul of the Riedbahn rail line<\/h1><\/div>\n\n\n<p>To improve quality, punctuality and significantly reduce disruption to the infrastructure, <a href=\"https:\/\/www.deutschebahn.com\/en\">Deutsche Bahn<\/a> (DB) will be bundling construction work on heavily used sections of track over the coming years and carrying out maintenance and investment measures as part of general overhauls lasting several months.<\/p>\n\n\n\n<p>The legal basis for this work was established in the amendment to the German Federal Railway Infrastructure Development Act passed in June 2024. It specifies a total of 41 corridors that are to be generally overhauled. The aim is to improve the condition of the infrastructure within the shortest possible period of time. The renewal and modernization includes sleepers and ballast, tracks and points, signals and signal boxes as well as the stations. Once the work has been completed, no major construction work is usually required for several years. In addition, the refurbished sections will be significantly more efficient, will be equipped to a first-class standard and will be prepared for the digital rail operations of the future.<\/p>\n\n\n\n<p>The so-called Riedbahn marks the start of this ambitious overhaul program. The approximately 70-kilometer route between Frankfurt am Main and Mannheim is located in the heart of Germany and connects the two metropolitan regions of Frankfurt\/Rhine-Main and Rhine-Neckar. With over 300 freight and passenger trains running daily, this highly frequented route is one of the most heavily used corridors in Germany&#8217;s rail infrastructure. On individual sections of the route, capacity utilization is over 150 percent and delays that occur here affect the entire rail network. This makes the Riedbahn a bottleneck with a particular need for renovation and expansion.<\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<p>Modernization work on the Riedbahn began on 15 July 2024. During a five-month line closure, 117 track kilometers, 152 points, 150 stops, 20 stations and 1,200 control and safety technology systems will be modernized and brought up to date to ensure the performance of this central section for the coming decades. For the duration of the closure, a traffic concept will ensure that passengers continue to reach their destinations reliably. For example, 150 modern replacement buses are deployed daily to replace local and regional services between Frankfurt and Mannheim. These cover around 1,000 journeys a day for the 15,000 passengers affected. Long-distance and freight traffic, on the other hand, will be rerouted during the work.<\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-4-medium is-offset-left-1-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-gallery  undefined--expanded\" data-delay=\"4\" data-auto-swipe=\"false\"><div class=\"gallery gallery--bullets-outside\"><div class=\"glide\"><div class=\"glide__track\" data-glide-el=\"track\"><ul class=\"glide__slides\">\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-2048x1365.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-1280x853.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-1920x1280.jpg 1920w\" alt=\"Track renewal from a bird's eye view\" width=\"2560\" height=\"1706\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (4 \/ 6)) + (35px * (4 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (4 \/ 6)) + (35px * (4 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/birds-eye-view-riedbahn-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Uli Planz<\/p&gt;\n\"><\/div><\/div><\/figure><\/li>\n\n\n\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-2048x1365.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-1280x853.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-1920x1280.jpg 1920w\" alt=\"employees on the construction site - Riedbahn corridor\" width=\"2560\" height=\"1707\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (4 \/ 6)) + (35px * (4 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (4 \/ 6)) + (35px * (4 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/construction_riedbahn_corridor-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Uli Planz<\/p&gt;\n\"><\/div><\/div><\/figure><\/li>\n\n\n\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-1024x681.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-768x511.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-1536x1022.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-2048x1363.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-520x346.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-768x511.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-1280x852.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-1920x1277.jpg 1920w\" alt=\"close-up of track construction\" width=\"2560\" height=\"1703\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (4 \/ 6)) + (35px * (4 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (4 \/ 6)) + (35px * (4 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/close-up-tracks-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Stefan Wildhirt<\/p&gt;\n\"><\/div><\/div><\/figure><\/li>\n<\/ul><\/div><div class=\"glide__footer\"><div class=\"glide__play-pause\"><button type=\"button\" class=\"glide__play-pause-button\" aria-label=\"play\/pause automatic swipe\"><svg aria-hidden=\"true\" class=\"controls__icon-pause\"><use xlink:href=\"#icon-pause\" \/><\/svg><svg aria-hidden=\"true\" class=\"controls__icon-play\"><use xlink:href=\"#icon-play-small\" \/><\/svg><\/button><\/div><div class=\"glide__bullets\" data-glide-el=\"controls[nav]\"><button class=\"glide__bullet\" aria-label=\"Go to slide 1\" data-glide-dir=\"=0\"><\/button><button class=\"glide__bullet\" aria-label=\"Go to slide 2\" data-glide-dir=\"=1\"><\/button><button class=\"glide__bullet\" aria-label=\"Go to slide 3\" data-glide-dir=\"=2\"><\/button><\/div><div><\/div><\/div><\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h3\">State-of-the-art electronic interlocking technology<\/h2>\n\n\n\n<p>100 days after the start of the Riedbahn, a significant milestone has been reached: The extensive inputs on rails, sleepers and ballast are nearing completion on schedule. In the last third of the general overhaul, the intensive phase begins, in which technicians install the new control and safety technology and gradually connect the electronic interlocking systems (ESTW). From the modern control stations of the new ESTW control centers in Walldorf, Gernsheim and Mannheim-Waldhof, large regional areas can be monitored and controlled at the click of a mouse.<\/p>\n\n\n\n<h2 class=\"wp-block-heading headline-h3\">European Train Control System for the Riedbahn<\/h2>\n\n\n\n<p>In addition to new interlocking technology, the new European Train Control System (ETCS) will also be used on the Riedbahn in future. Thousands of balises will be installed along the track by mid-December 2024 in order to store and transmit operational information to the trains. This train control system enables the standardization of signalling equipment and is intended to replace the more than 20 different train control systems in Europe in the long term. The general overhaul of the Riedbahn is due to be completed by the timetable change in mid-December 2024, meaning that regional, freight and long-distance trains will once again be able to run on schedule over the completely renovated Riedbahn from 15 December. This is a major step toward stabilizing rail operations and ensuring on-time and reliable train service over the long term.<\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h3\">Project data<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Frankfurt am Main \u2013 Mannheim<\/li>\n\n\n\n<li>Length of line: 70&nbsp;km<\/li>\n\n\n\n<li>Underground cable installation along the line<\/li>\n\n\n\n<li>Partial track renewal, work on permanent way with switch renewals, switch dismantling<\/li>\n\n\n\n<li>Renewal of multiple railroad crossings<\/li>\n\n\n\n<li>New construction of GSM-R masts<\/li>\n\n\n\n<li>Construction of 3 central electronic signal boxes<\/li>\n\n\n\n<li>Construction of several module buildings along the route<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-2048x1366.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-1280x854.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-1920x1280.jpg 1920w\" alt=\"General overhaul Riedbahn rail line\" width=\"2560\" height=\"1707\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-work-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<p>DB E&amp;C is also doing a remarkable job: even before the official start of the general overhaul, our teams were already working hard to upgrade the detour routes for long-distance and freight traffic on various sections. One outstanding example is the lifting of the railroad overpass in Hochspeyer, which was supervised by our colleagues from construction supervision in April 2024 in close cooperation with the construction companies involved.<\/p>\n\n\n\n<p>Our team was also fully committed shortly before the start of the general overhaul. The routes through the Kupferschmelztunnel and the Imsweiler Tunnel were opened in time for the detour of freight traffic. Within just seven weeks, we succeeded in widening the tunnel cross-sections &#8211; thanks to intensive work such as anchor drilling, milling of stones and rock and the application of shotcrete.<\/p>\n\n\n\n<p>In addition, DB E&amp;C&#8217;s active support for the Riedbahn general overhaul includes design, validation and assessment, and environmental and geoservices.&nbsp;<\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h3\">Scope of services<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/design\/\">Design<\/a>\n<ul class=\"wp-block-list\">\n<li>Superstructure<\/li>\n\n\n\n<li>Drainage<\/li>\n\n\n\n<li>Stations<\/li>\n\n\n\n<li>Underground cable installation<\/li>\n\n\n\n<li>Control-command and signaling (electronic interlocking and ETCS)<\/li>\n\n\n\n<li>Electrical and overhead line equipment<\/li>\n\n\n\n<li>Telecommunications<\/li>\n\n\n\n<li>Noise-control systems<\/li>\n\n\n\n<li>Railroad overpasses<\/li>\n\n\n\n<li>Lightning Protection<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/construction-supervision\/#construction-supervision\">Construction supervision<\/a>\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/construction-supervision\/#construction-scheduling\">Construction and operations planning<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/construction-supervision\/#construction-management\">Implementation management<\/a><\/li>\n\n\n\n<li>Multicopter flights and data provision in <a href=\"https:\/\/db-eco.com\/en\/insights\/unmanned-aircraft-systems\/x2bim-data-platform\/\">X2BIM<\/a> including <a href=\"https:\/\/db-eco.com\/en\/insights\/unmanned-aircraft-systems\/preparing-and-performing-flights\/\">preparing and performing flights<\/a><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/validation-and-assessment\/\">Validation and Assessment<\/a>\n<ul class=\"wp-block-list\">\n<li>Design review and validation testing services in the following areas<ul><li>Control-command and signaling<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Overhead line equipment<\/li>\n\n\n\n<li>Electrical power systems<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/environmental-and-geoservices\/\">Environmental and Geoservices<\/a>\n<ul class=\"wp-block-list\">\n<li>Preparation of geotechnical reports, base calculation, culverts, stations, signal brackets, etc.<\/li>\n\n\n\n<li><span style=\"color: initial;\">Geotechnical consulting during the detailed design<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Discipline-specific geotechnical construction supervision, acceptance and technical inspection<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Geotechnical consulting during the detailed design<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Preparing requests relating to water impact for submission to the German Federal Railway Authority (EBA) for<\/span>\n<ul class=\"wp-block-list\">\n<li><span style=\"color: initial;\">Discharging wastewater into bodies of water<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Discharging substances into bodies of water<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Using bodies of water during construction (dewatering measures)<\/span><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><span style=\"color: initial;\">Preparing requests relating to water impact for submission to the lower water authorities for the discharge of wastewater into public wastewater systems (indirect discharge)<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Notifying the EBA of excavation and drilling that could affect the groundwater<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Hydrogeological consulting during detailed design and construction<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Surveying and creating transverse profiles at the site of planned signals<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Providing surveying support for multicopter flights and Video2BIM recordings by setting and measuring ground control points<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Installing and measuring reference points for the measuring train<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Surveying culverts for structural engineering<\/span><\/li>\n\n\n\n<li><span style=\"color: initial;\">Measuring the track geometry of side tracks and switches<\/span><\/li>\n\n\n\n<li>Existing route alignment in the Mannheim-Waldhof station area<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/insights\/geotechnical-monitoring\/\">Geotechnical monitoring<\/a>\n<ul class=\"wp-block-list\">\n<li>Post-landslide during first test closure in January 2024<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-e1732012969214.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-300x197.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-1024x672.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-768x504.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-1536x1008.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-520x341.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-768x504.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-1280x840.jpg 1280w\" alt=\"Track conversion train in Gro\u00df-Rohrheim\" width=\"3291\" height=\"2160\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/track-conversion-train-riedbahn-e1732012969214.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-2048x1365.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-1280x853.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-1920x1280.jpg 1920w\" alt=\"excavator on construction site\" width=\"2560\" height=\"1707\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/excavator-at-construction-site-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Stefan Wildhirt<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-e1732013164890.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-300x194.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-1024x663.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-768x497.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-1536x994.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-520x337.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-768x497.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-1280x828.jpg 1280w\" alt=\"Construction of noise barriers\" width=\"3338\" height=\"2160\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-noise-barriers-e1732013164890.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-300x192.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-1024x656.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-768x492.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-1536x983.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-2048x1311.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-520x333.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-768x492.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-1280x820.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-1920x1229.jpg 1920w\" alt=\"Installation of a switch with track crane\" width=\"2560\" height=\"1639\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-track-crane-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-scaled.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-300x204.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-1024x696.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-768x522.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-1536x1044.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-2048x1391.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-520x353.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-768x522.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-1280x870.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-1920x1304.jpg 1920w\" alt=\"Building a turnout in M\u00f6rfelden\" width=\"2560\" height=\"1739\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><script data-name=\"style-options\" type=\"application\/json\">{\"closeButtonColor\":\"red\"}<\/script><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/riedbahn-construction-turnout-scaled.jpg&quot;)\"><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"<p&gt;Deutsche Bahn AG \/ Oliver Lang<\/p&gt;\n\"><\/div><\/div><\/figure><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-linked-items  wp-block-dbec-core-layout-linked-items--expanded\"><section class=\"layout-linked-items\"><div class=\"layout-linked-items__header\"><div class=\"grid\"><div class=\"column is-6-small is-3-medium\"><h2 class=\"layout-linked-items__headline\">Further projects<\/h2><\/div><div class=\"column is-6-small is-3-medium\"><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--top\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/div><\/div><\/div><div class=\"layout-linked-items__inner\"><div class=\"related-posts\"><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/feasibility-study-india-for-high-speed-transport\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"513\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/04\/DSC_0804.jpg\" class=\"base-card__image wp-post-image\" alt=\"High speed transport - Feasibility study - India\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" \/><div class=\"label-reference\" data-image-reference=\"Simon Giovanazzi\"><\/div><\/figure><h3 class=\"base-card__title\">Feasibility study for high speed transport, India<\/h3><div class=\"base-card__date\">Asia<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/abs-38-munich-freilassing\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/05\/20150331_Sc-10.jpg\" class=\"base-card__image wp-post-image\" alt=\"Baustelle\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" \/><div class=\"label-reference\" data-image-reference=\"DB Engineering &#038; Consulting\"><\/div><\/figure><h3 class=\"base-card__title\">Line upgrade project: ABS 38, Munich \u2013 M\u00fchldorf \u2013 Freilassing, Germany<\/h3><div class=\"base-card__date\">Europe<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/frankfurt-central-hub\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude-768x512.jpg\" class=\"base-card__image wp-post-image\" alt=\"Knoten Frankfurt:\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude-1024x682.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude-1280x853.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Knoten-Frankfurt_DBEC_Tim-Dippel-Hauptgebaeude.jpg 1295w\" \/><div class=\"label-reference\" data-image-reference=\"DB Engineering &#038; Consulting \/ Tim Dippel\"><\/div><\/figure><h3 class=\"base-card__title\">Frankfurt Central hub<\/h3><div class=\"base-card__date\">Europe<\/div><\/a><\/div><\/div><\/div><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--bottom\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/section><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"featured_media":24201,"template":"","meta":{"post_allow-other-domains":""},"dbec_region":[35,79],"dbec_issue":[53,49,48,50],"dbec_product":[43,40,1194,45],"class_list":["post-17872","dbec_project","type-dbec_project","status-publish","has-post-thumbnail","hentry","dbec_region-europe","dbec_region-germany","dbec_issue-digitalization","dbec_issue-long-distance-transport","dbec_issue-passenger-transport","dbec_issue-regional-and-local-transport","dbec_product-construction-supervision","dbec_product-design","dbec_product-digital-engineering","dbec_product-environment-and-geo-services"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Riedbahn rail line - General overhaul | DB E&amp;C<\/title>\n<meta name=\"description\" content=\"The Riedbahn corridor is being modernized and expanded. Find out here how DB E&amp;C is contributing to this project!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"General overhaul of the Riedbahn rail line\" \/>\n<meta property=\"og:description\" content=\"The Riedbahn corridor is being modernized and expanded. Find out here how DB E&amp;C is contributing to this project!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/\" \/>\n<meta property=\"og:site_name\" content=\"DB Engineering &amp; Consulting\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-19T10:22:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/\",\"name\":\"Riedbahn rail line - General overhaul | DB E&C\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/Riedbahn_Corridor-scaled.jpg\",\"datePublished\":\"2024-11-26T10:22:00+00:00\",\"dateModified\":\"2026-01-19T10:22:46+00:00\",\"description\":\"The Riedbahn corridor is being modernized and expanded. Find out here how DB E&C is contributing to this project!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/#primaryimage\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/Riedbahn_Corridor-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/Riedbahn_Corridor-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Deutsche Bahn AG \\\/ Uli Planz\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/general-overhaul-of-the-riedbahn-rail-line\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"General overhaul of the Riedbahn rail line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"name\":\"DB Engineering & Consulting\",\"description\":\"Part of DB E.C.O. Group\",\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\",\"name\":\"DB Engineering & Consulting GmbH\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"width\":2560,\"height\":454,\"caption\":\"DB Engineering & Consulting GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/db-engineering-consulting\\\/\"],\"description\":\"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.\",\"email\":\"db-engineering-consulting@db-eco.com\",\"legalName\":\"DB Engineering & Consulting GmbH\",\"foundingDate\":\"1966-05-26\",\"vatID\":\"DE 114 139 523\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"5001\",\"maxValue\":\"10000\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Riedbahn rail line - General overhaul | DB E&C","description":"The Riedbahn corridor is being modernized and expanded. Find out here how DB E&C is contributing to this project!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/","og_locale":"en_US","og_type":"article","og_title":"General overhaul of the Riedbahn rail line","og_description":"The Riedbahn corridor is being modernized and expanded. Find out here how DB E&C is contributing to this project!","og_url":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/","og_site_name":"DB Engineering &amp; Consulting","article_modified_time":"2026-01-19T10:22:46+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/","url":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/","name":"Riedbahn rail line - General overhaul | DB E&C","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/#primaryimage"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-scaled.jpg","datePublished":"2024-11-26T10:22:00+00:00","dateModified":"2026-01-19T10:22:46+00:00","description":"The Riedbahn corridor is being modernized and expanded. Find out here how DB E&C is contributing to this project!","breadcrumb":{"@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/#primaryimage","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-scaled.jpg","width":2560,"height":1707,"caption":"Deutsche Bahn AG \/ Uli Planz"},{"@type":"BreadcrumbList","@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/general-overhaul-of-the-riedbahn-rail-line\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/db-engineering-consulting.com\/en\/"},{"@type":"ListItem","position":2,"name":"General overhaul of the Riedbahn rail line"}]},{"@type":"WebSite","@id":"https:\/\/db-engineering-consulting.com\/en\/#website","url":"https:\/\/db-engineering-consulting.com\/en\/","name":"DB Engineering & Consulting","description":"Part of DB E.C.O. Group","publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/db-engineering-consulting.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/db-engineering-consulting.com\/en\/#organization","name":"DB Engineering & Consulting GmbH","url":"https:\/\/db-engineering-consulting.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","width":2560,"height":454,"caption":"DB Engineering & Consulting GmbH"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/db-engineering-consulting\/"],"description":"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.","email":"db-engineering-consulting@db-eco.com","legalName":"DB Engineering & Consulting GmbH","foundingDate":"1966-05-26","vatID":"DE 114 139 523","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"5001","maxValue":"10000"}}]}},"dbec_featured_media":{"source_url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-300x200.jpg","source_set":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-2048x1365.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1280x853.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/07\/Riedbahn_Corridor-1920x1280.jpg 1920w","caption":"Deutsche Bahn AG \/ Uli Planz","alt":"Track construction work, aerial view"},"dbec_terms_region":[{"term_id":35,"name":"Europe","slug":"europe","term_group":0,"term_taxonomy_id":35,"taxonomy":"dbec_region","description":"","parent":0,"count":56,"filter":"raw"},{"term_id":79,"name":"Germany","slug":"germany","term_group":0,"term_taxonomy_id":79,"taxonomy":"dbec_region","description":"","parent":0,"count":66,"filter":"raw"}],"post_views":12661,"_links":{"self":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_project\/17872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_project"}],"about":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/types\/dbec_project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media\/24201"}],"wp:attachment":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media?parent=17872"}],"wp:term":[{"taxonomy":"dbec_region","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_region?post=17872"},{"taxonomy":"dbec_issue","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_issue?post=17872"},{"taxonomy":"dbec_product","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_product?post=17872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}