{"id":7322,"date":"2023-01-12T10:11:00","date_gmt":"2023-01-12T10:11:00","guid":{"rendered":"https:\/\/db-engineering-consulting.com\/dbec_project\/mumbai-metro-line-4-indien\/"},"modified":"2025-05-07T00:00:16","modified_gmt":"2025-05-07T00:00:16","slug":"metro-mumbai","status":"publish","type":"dbec_project","link":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/","title":{"rendered":"Mumbai Metro, India"},"content":{"rendered":"\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-header-gallery  undefined--expanded\" data-delay=\"4\" data-auto-swipe=\"false\"><div class=\"gallery gallery--bullets-outside gallery--static\"><div class=\"glide\"><div class=\"glide__track\" data-glide-el=\"track\"><ul class=\"glide__slides\">\n<li class=\"wp-block-dbec-core-slide-header  glide__slide\" data-autoplay=\"false\"><div class=\"slide-header slide-header--banner-height\"><div><img loading=\"lazy\" decoding=\"async\" class=\"slide-header__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1024x683.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-768x512.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1280x854.jpg 640w\" alt=\"Metro Mumbai: construction site of metro mumbai line 4 with the city panorama\" width=\"1600\" height=\"1067\"\/><div class=\"slide-header__cover\"><\/div><\/div><div class=\"label-reference-container\"><div class=\"label-reference label-reference--static\" data-image-reference=\"Jitesh Ganatra\"><\/div><\/div><div class=\"slide-header__inner\"><div class=\"slide-header__center\"><div class=\"slide-header__container-headlines\"><\/div><\/div><\/div><\/div><\/li>\n<\/ul><\/div><div class=\"glide__footer\"><div class=\"glide__play-pause\"><button type=\"button\" class=\"glide__play-pause-button\" aria-label=\"play\/pause automatic swipe\"><svg aria-hidden=\"true\" class=\"controls__icon-pause\"><use xlink:href=\"#icon-pause\" \/><\/svg><svg aria-hidden=\"true\" class=\"controls__icon-play\"><use xlink:href=\"#icon-play-small\" \/><\/svg><\/button><\/div><div class=\"glide__bullets\" data-glide-el=\"controls[nav]\"><button class=\"glide__bullet\" aria-label=\"Go to slide 1\" data-glide-dir=\"=0\"><\/button><\/div><div><\/div><\/div><\/div><\/div><\/div>\n\n\n<nav class=\"breadcrumbs\"><div class=\"breadcrumbs__inner\"><a class=\"breadcrumbs__home\" href=\"https:\/\/db-engineering-consulting.com\/en\/\" aria-label=\"Link Home\"><svg class=\"breadcrumbs__home-icon\"><use xlink:href=\"#home\"><\/use><\/svg><\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg> <a data-is-distributor=\"true\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/\">Projects<\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><span class=\"breadcrumbs__actual-page\">Mumbai Metro, India<\/span><\/div><\/nav><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\"><div class=\"wp-block-dbec-core-social-sharing\"><div class=\"social-sharing\" data-subject=\"Here is an article for you: [TITLE]\" data-recipient=\"mail recipient en\" data-body=\"Here is an article by DB Engineering &#038; Consulting for you: [TITLE] at [LINK]\"><span class=\"social-sharing__label\">Share<\/span><div class=\"social-sharing__links\"><a class=\"social-sharing__link social-sharing__link--linkedin\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link LinkedIn\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-linked-in\"\/><\/svg><\/a><a class=\"social-sharing__link social-sharing__link--mail\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link Mail\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-mail\"\/><\/svg><\/a><\/div><\/div><\/div>\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park-1024x683.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park-768x512.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park-1280x854.jpg 640w\" alt=\"Metro Mumbai: Mumbai Metro Line 4, India - view of the construction site with a park in the background\" width=\"1600\" height=\"1067\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-birds_eye_on_the_construction_site_a_street_and_park.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Construction of the Mumbai Metro Line 4 viaduct<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"Jitesh Ganatra\"><\/div><\/div><figcaption class=\"figure__caption\">Construction of the Mumbai Metro Line 4 viaduct<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city-1024x683.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city-768x512.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city-1280x854.jpg 640w\" alt=\"Mumbai Metro: aerial view of the construction site with a park and Mumbai city in the background  \" width=\"1600\" height=\"1067\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-view_from_the_air_on_the_construction_site_trees_and_mumbai_city.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Aerial view of thr Mumbai Metro construction site<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"Jitesh Ganatra\"><\/div><\/div><figcaption class=\"figure__caption\">Aerial view of thr Mumbai Metro construction site<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic-1024x683.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic-768x512.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic-1280x854.jpg 640w\" alt=\"Mumbai Metro: close-up of construction site in the middle of traffic \" width=\"1600\" height=\"1067\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-construction_site_in_the_middle_of_a_street_with_traffic.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>The new metro line will ease traffic in the city in the future<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"Jitesh Ganatra\"><\/div><\/div><figcaption class=\"figure__caption\">The new metro line will ease traffic in the city in the future<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements-1024x683.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements-768x512.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements-1280x854.jpg 640w\" alt=\"Metro Mumbai: Building elements in the evening light\" width=\"1600\" height=\"1067\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2018\/06\/metro_mumbai-evening_view_of_the_construction_elements.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Storage for the viaduct prefabricated parts <\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"Jitesh Ganatra\"><\/div><\/div><figcaption class=\"figure__caption\">Storage for the viaduct prefabricated parts <\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1024x683.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-768x512.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1280x854.jpg 640w\" alt=\"Metro Mumbai: construction site of metro mumbai line 4 with the city panorama\" width=\"1600\" height=\"1067\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Construction site with the city panorama in the background<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"Jitesh Ganatra\"><\/div><\/div><figcaption class=\"figure__caption\">Construction site with the city panorama in the background<\/figcaption><\/figure><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"article-header\"><h1 class=\"article-header__headline\">Mumbai Metro, India<\/h1><\/div>\n\n\n<p>Mumbai is the second-fastest growing city in India. Its population is estimated to reach nearly 28 million by 2030, making it the fourth&nbsp;most populous metropolitan area in the world. Due to Mumbai\u2019s rapid growth, road and rail infrastructure development has not been able to keep pace with the increasing demand over the last decades. As a result, the Mumbai Metropolitan Region Development Authority (<a href=\"https:\/\/mmrda.maharashtra.gov.in\/home\" target=\"_blank\" rel=\"noreferrer noopener\">MMRDA<\/a>) unveiled a master plan in 2004 to provide mass rapid transit services. The system is designed to reduce traffic congestion in the city and supplement the existing network.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-accordion  wp-block-dbec-core-accordion--expanded\"><div class=\"accordion\" data-type=\"single\" data-initially-opened=\"false\"><div class=\"accordion__items\">\n<div class=\"wp-block-dbec-core-accordion-item\"><a-expandable id=\"\" class=\"accordion-item\"><button type=\"button\" slot=\"toggle\" class=\"accordion-item__bar\"><h3 class=\"accordion-item__label\">Mumbai Metro Line 4<\/h3><svg class=\"accordion-item__arrow\" aria-hidden=\"true\"><use xlink:href=\"#icon-arrow-down\" \/><\/svg><\/button><div class=\"accordion-item__content\"><div class=\"layout-content\">\n<p><a href=\"https:\/\/mmrda.maharashtra.gov.in\/metro-line-4\" target=\"_blank\" rel=\"noreferrer noopener\">Mumbai Metro Line 4<\/a>&nbsp;is a new metro line connecting Wadala to Kasarvadavali. The line consists of a 35.26&nbsp;km elevated double track viaduct (U-girders) and includes a total of 30 stations.<\/p>\n\n\n\n<p>In 2019, the line was extended by two stations to Gaimukh as Line 4A via an additional 2.66 km viaduct. The project was awarded to a consortium made up of DB Engineering &amp; Consulting,&nbsp;<a href=\"https:\/\/www.hill-international.com\/en-EU\/index\" target=\"_blank\" rel=\"noreferrer noopener\">Hill International<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/www.louisbergerinternational.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Louis Berger<\/a>&nbsp;as an extension of the existing general consultancy contract.<\/p>\n\n\n\n<p>The project includes civil infrastructure features such as elevated viaducts, stations, and depots with attached workshops, and rail systems such as tracks, signaling, telecommunications, power supply, automated fare collection and overhead contact line systems.<\/p>\n\n\n\n<p>The metro line will provide a fast, convenient, reliable and safe mode of transport from Wadala \u2013 Ghatkopar \u2013 Mulund \u2013 Thane \u2013 Kasarvadavali to Gaimukh using the latest CBTC GoA4 technology.<\/p>\n\n\n\n<p>Completion of the Mumbai Metro Line 4 project is crucial for increasing the capacity of the transport network and accommodating the city\u2019s steadily growing population. Once fully operational, the line will carry 1.22 million passengers every day.<\/p>\n<\/div><\/div><\/a-expandable><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-accordion-item\"><a-expandable id=\"\" class=\"accordion-item\"><button type=\"button\" slot=\"toggle\" class=\"accordion-item__bar\"><h3 class=\"accordion-item__label\">Mumbai Metro Lines 10 and 12<\/h3><svg class=\"accordion-item__arrow\" aria-hidden=\"true\"><use xlink:href=\"#icon-arrow-down\" \/><\/svg><\/button><div class=\"accordion-item__content\"><div class=\"layout-content\">\n<p><a href=\"https:\/\/mmrda.maharashtra.gov.in\/documents\/10180\/9283015\/Metro+Line+10\/076595c3-c882-424c-b49d-f22399e9a096\" target=\"_blank\" rel=\"noreferrer noopener\">Mumbai Metro Line 10<\/a>&nbsp;is planned to be an elevated metro rail line in the length of 9.21 km extending from Gaimukh to Shivaji Chowk (Mira Road), with 4 elevated stations. <\/p>\n\n\n\n<p><a href=\"https:\/\/mmrda.maharashtra.gov.in\/documents\/10180\/9283015\/Metro+Line+12\/20c81fcb-0b2c-40c2-9e06-a7b4e7d46bdb\" target=\"_blank\" rel=\"noreferrer noopener\">Mumbai Metro Line 12&nbsp;<\/a>will also be an elevated metro line with a total length of 20.76 km, reaching from Kalyan to Taloja and including 17 elevated stations. The depot is planned to be placed near the Pisarve Depot station, on a 20 ha plot of land.<\/p>\n\n\n\n<p>The projects will provide rail systems such as tracks, signaling, telecommunications, power supply, automated fare collection and overhead contact line systems as well as civil infrastructure such as elevated viaducts, stations and depots with attached workshops.<\/p>\n\n\n\n<p>Both lines are planned to be provided with a standard gauge of 1435 mm and 3200 mm wide rolling stock and to operate at maximum safe speed of 90 km\/h.<\/p>\n\n\n\n<p>The metro lines will provide a much faster and safer mode of transport from Gaimukh to Shivaji Chowk (Mira Road) and Kalyan to Taloja, also&nbsp;using the CBTC GoA4 technology.<\/p>\n<\/div><\/div><\/a-expandable><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h3\">Consortium takes on the role of engineer<\/h2>\n\n\n\n<p>DB Engineering &amp; Consulting and its consortium partners are representing Mumbai Metropolitan Region Development Authority (<a href=\"https:\/\/mmrda.maharashtra.gov.in\/home\" target=\"_blank\" rel=\"noreferrer noopener\">MMRDA<\/a>) in the role of engineer as defined in the framework agreement. Responsibilities include overall&nbsp;<a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/project-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">project management<\/a>,&nbsp;<a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/design\/\" target=\"_blank\" rel=\"noreferrer noopener\">design<\/a>, assistance with procurement, construction management,&nbsp;<a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/construction-supervision\/\" target=\"_blank\" rel=\"noreferrer noopener\">construction supervision<\/a>, system integration, interface management,&nbsp;<a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/testing-and-commissioning\/\" target=\"_blank\" rel=\"noreferrer noopener\">testing and commissioning<\/a>.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h3\">Project data at a glance<\/h2>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<p><strong>Mumbai <strong>Metro<\/strong> Line 4<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>26 km of elevated viaduct<\/li>\n\n\n\n<li>32 stations, including 6 interchange stations with various other lines of Mumbai metro rail<\/li>\n\n\n\n<li>1 depot with an attached workshop along with an operations control center (OCC) and backup control center (BCC) in Kasarvadavali<\/li>\n\n\n\n<li>Standard gauge (1435 mm)<\/li>\n\n\n\n<li>3200 mm wide rolling stock<\/li>\n\n\n\n<li>25 kV AC overhead equipment traction<\/li>\n\n\n\n<li>Communication-based train control (CBTC) signaling system with Grade of Automation 4 (GoA-4) including depot operations<\/li>\n\n\n\n<li>Automated fare collection and platform screen doors<\/li>\n\n\n\n<li>Passenger transport stations<\/li>\n\n\n\n<li>Power supply installation<\/li>\n\n\n\n<li>New-build line\n<ul class=\"wp-block-list\">\n<li>Superstructure system: slab track, ballast track, special construction<\/li>\n\n\n\n<li>Number of tracks: 2<\/li>\n\n\n\n<li>Line length: 35.26 km<\/li>\n\n\n\n<li>Design speed: 90 km\/h<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Metro\n<ul class=\"wp-block-list\">\n<li>Line length: 35.26 km<\/li>\n\n\n\n<li>Electrified<\/li>\n\n\n\n<li>Design speed: 90 km\/h<\/li>\n\n\n\n<li>Number of lines: 1<\/li>\n\n\n\n<li>Number of tracks: 2<\/li>\n\n\n\n<li>Number of stations: 32<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Individual specification: elevated metro rail<\/li>\n\n\n\n<li>Repair work facility (complete overhaul)<\/li>\n\n\n\n<li>Equipment: maintenance and repair facility, measuring, test and inspection facility<\/li>\n\n\n\n<li>Maintenance and re\n<ul class=\"wp-block-list\">\n<li>Auxiliary building<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<p><strong>Mumbai <strong>Metro<\/strong> Line 10 and 12<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>4 elevated stations (Mumbai Metro Line 10) and 17 elevated stations (Mumbai Metro Line 12)<\/li>\n\n\n\n<li>Depot at Pisarve Depot Station (Metro Line 12)<\/li>\n\n\n\n<li>Standard gauge (1435 mm)<\/li>\n\n\n\n<li>3200 mm wide rolling stock<\/li>\n\n\n\n<li>Communication-based train control (CBTC) signaling system with Grade of Automation 4 (GoA-4) including depot operations<\/li>\n\n\n\n<li>Automated fare collection and platform screen doors<\/li>\n\n\n\n<li>New-build line<ul><li>Line length: 9.21 km (Metro Line 10) and 20.76 km (Metro Line 12)<\/li><li>Superstructure system: slab track, ballast track, special construction<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Number of tracks: 2<\/li>\n\n\n\n<li>Design speed: 90 km\/h<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Metro\n<ul class=\"wp-block-list\">\n<li>Design Speed: 90 km\/h<\/li>\n\n\n\n<li>Number of lines: 1<\/li>\n\n\n\n<li>Number of tracks: 2 <\/li>\n\n\n\n<li>Individual specification: elevated metro rail<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Maintenance and Repair depot\n<ul class=\"wp-block-list\">\n<li>Auxiliary building<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h3\">Scope of services for Metro Lines 4, 10 and 12:<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>General consultancy includes all aspects of project implementation from concept to commissioning<\/li>\n\n\n\n<li>General consultant prepares specifications, evaluates bids and reviews detailed designs, oversees rail system fabrication and installation, and testing and commissioning of rail systems until commissioner for metro rail safety (CMRS) certification for passenger service is obtained<\/li>\n\n\n\n<li>General consulting and project management support to the client on technical, organizational and contractual issues related to general consulting for the metro rail in the following phases:\n<ul class=\"wp-block-list\">\n<li>Preliminary <a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/design\/\" target=\"_blank\" rel=\"noreferrer noopener\">design<\/a> and tender support&nbsp;<\/li>\n\n\n\n<li>Proof checking of detailed design<\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/construction-supervision\/\" target=\"_blank\" rel=\"noreferrer noopener\">Construction supervision&nbsp;<\/a><\/li>\n\n\n\n<li>Rolling stock<\/li>\n\n\n\n<li>Traction power supply&nbsp;<\/li>\n\n\n\n<li>Signaling and telecommunications<\/li>\n\n\n\n<li>Quality control<\/li>\n\n\n\n<li><a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/testing-and-commissioning\/\" target=\"_blank\" rel=\"noreferrer noopener\">Testing and commissioning<\/a><\/li>\n\n\n\n<li>Operation and maintenance support (Mumbai Metro Line 4)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>All the above services are being provided within the framework of a consortium agreement<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-linked-items  wp-block-dbec-core-layout-linked-items--expanded\"><section class=\"layout-linked-items\"><div class=\"layout-linked-items__header\"><div class=\"grid\"><div class=\"column is-6-small is-3-medium\"><h2 class=\"layout-linked-items__headline\">Further projects<\/h2><\/div><div class=\"column is-6-small is-3-medium\"><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--top\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/de\/projekte\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/div><\/div><\/div><div class=\"layout-linked-items__inner\"><div class=\"related-posts\"><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/new-construction-logistics-for-dusseldorf-stabling-station\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"395\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-768x395.png\" class=\"base-card__image wp-post-image\" alt=\"D\u00fcsseldorf stabling station - visualization\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-768x395.png 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-300x154.png 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-1024x527.png 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-1536x790.png 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-520x267.png 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1-1280x658.png 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/01\/Duesseldorf_stabling_station_visualization_1.png 1754w\" \/><div class=\"label-reference\" data-image-reference=\"DB InfraGO\"><\/div><\/figure><h3 class=\"base-card__title\">New construction logistics for D\u00fcsseldorf stabling station\u00a0\u00a0\u00a0<\/h3><div class=\"base-card__date\">Germany<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/tel-aviv-metro-light-rail-transit-system-integration\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"265\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/02\/1-telaviv-purpeline_nta-metropolitan-mass-transit-sy-768x265.jpeg\" class=\"base-card__image wp-post-image\" alt=\"Tel Aviv Metro - Israel light rail, Purple Line\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/02\/1-telaviv-purpeline_nta-metropolitan-mass-transit-sy-768x265.jpeg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/02\/1-telaviv-purpeline_nta-metropolitan-mass-transit-sy-1024x353.jpeg 1024w\" \/><div class=\"label-reference\" data-image-reference=\"NTA Metropolitan Mass Transit System Ltd\"><\/div><\/figure><h3 class=\"base-card__title\">Light Rail Transit System Integration, Tel Aviv, Israel<\/h3><div class=\"base-card__date\">Asia<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/automated-people-mover-pnu-in-riyadh\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"267\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/05\/DSCN5067_Heinz-Weinberger.jpg\" class=\"base-card__image wp-post-image\" alt=\"Hochbahn\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" \/><div class=\"label-reference\" data-image-reference=\"Heinz Weinberger\"><\/div><\/figure><h3 class=\"base-card__title\">Automated People Mover &#8211; PNU, Saudi Arabia<\/h3><div class=\"base-card__date\">Asia<\/div><\/a><\/div><\/div><\/div><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--bottom\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/de\/projekte\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/section><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"featured_media":20119,"template":"","meta":{"post_allow-other-domains":""},"dbec_region":[36],"dbec_issue":[],"dbec_product":[],"class_list":["post-7322","dbec_project","type-dbec_project","status-publish","has-post-thumbnail","hentry","dbec_region-asia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Metro Mumbai: an elevated railway project | DB E&amp;C<\/title>\n<meta name=\"description\" content=\"The new Metro Mumbai will increase the capacity of transportation in the region. Learn more about the exciting projects here!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mumbai Metro, India\" \/>\n<meta property=\"og:description\" content=\"The new Metro Mumbai will increase the capacity of transportation in the region. Learn more about the exciting projects here!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/\" \/>\n<meta property=\"og:site_name\" content=\"DB Engineering &amp; Consulting\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-07T00:00:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1067\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/\",\"name\":\"Metro Mumbai: an elevated railway project | DB E&C\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg\",\"datePublished\":\"2023-01-12T10:11:00+00:00\",\"dateModified\":\"2025-05-07T00:00:16+00:00\",\"description\":\"The new Metro Mumbai will increase the capacity of transportation in the region. Learn more about the exciting projects here!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/#primaryimage\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg\",\"width\":1600,\"height\":1067,\"caption\":\"Jitesh Ganatra\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/projects\\\/metro-mumbai\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mumbai Metro, India\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"name\":\"DB Engineering & Consulting\",\"description\":\"Part of DB E.C.O. Group\",\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\",\"name\":\"DB Engineering & Consulting GmbH\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"width\":2560,\"height\":454,\"caption\":\"DB Engineering & Consulting GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/db-engineering-consulting\\\/\"],\"description\":\"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.\",\"email\":\"db-engineering-consulting@db-eco.com\",\"legalName\":\"DB Engineering & Consulting GmbH\",\"foundingDate\":\"1966-05-26\",\"vatID\":\"DE 114 139 523\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"5001\",\"maxValue\":\"10000\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Metro Mumbai: an elevated railway project | DB E&C","description":"The new Metro Mumbai will increase the capacity of transportation in the region. Learn more about the exciting projects here!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/","og_locale":"en_US","og_type":"article","og_title":"Mumbai Metro, India","og_description":"The new Metro Mumbai will increase the capacity of transportation in the region. Learn more about the exciting projects here!","og_url":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/","og_site_name":"DB Engineering &amp; Consulting","article_modified_time":"2025-05-07T00:00:16+00:00","og_image":[{"width":1600,"height":1067,"url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/","url":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/","name":"Metro Mumbai: an elevated railway project | DB E&C","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/#primaryimage"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg","datePublished":"2023-01-12T10:11:00+00:00","dateModified":"2025-05-07T00:00:16+00:00","description":"The new Metro Mumbai will increase the capacity of transportation in the region. Learn more about the exciting projects here!","breadcrumb":{"@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/#primaryimage","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg","width":1600,"height":1067,"caption":"Jitesh Ganatra"},{"@type":"BreadcrumbList","@id":"https:\/\/db-engineering-consulting.com\/en\/projects\/metro-mumbai\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/db-engineering-consulting.com\/en\/"},{"@type":"ListItem","position":2,"name":"Mumbai Metro, India"}]},{"@type":"WebSite","@id":"https:\/\/db-engineering-consulting.com\/en\/#website","url":"https:\/\/db-engineering-consulting.com\/en\/","name":"DB Engineering & Consulting","description":"Part of DB E.C.O. Group","publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/db-engineering-consulting.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/db-engineering-consulting.com\/en\/#organization","name":"DB Engineering & Consulting GmbH","url":"https:\/\/db-engineering-consulting.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","width":2560,"height":454,"caption":"DB Engineering & Consulting GmbH"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/db-engineering-consulting\/"],"description":"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.","email":"db-engineering-consulting@db-eco.com","legalName":"DB Engineering & Consulting GmbH","foundingDate":"1966-05-26","vatID":"DE 114 139 523","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"5001","maxValue":"10000"}}]}},"dbec_featured_media":{"source_url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-300x200.jpg","source_set":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1024x683.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-768x512.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1536x1024.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-520x347.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle-1280x854.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/07\/metro_mumbai-city_panorama_with_the_construction_site_in_the_middle.jpg 1600w","caption":"Jitesh Ganatra","alt":"Metro Mumbai: construction site of metro mumbai line 4 with the city panorama"},"dbec_terms_region":[{"term_id":36,"name":"Asia","slug":"asia","term_group":0,"term_taxonomy_id":36,"taxonomy":"dbec_region","description":"","parent":0,"count":17,"filter":"raw"}],"post_views":34456,"_links":{"self":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_project\/7322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_project"}],"about":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/types\/dbec_project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media\/20119"}],"wp:attachment":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media?parent=7322"}],"wp:term":[{"taxonomy":"dbec_region","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_region?post=7322"},{"taxonomy":"dbec_issue","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_issue?post=7322"},{"taxonomy":"dbec_product","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/dbec_product?post=7322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}