{"id":10656,"date":"2021-06-08T08:00:42","date_gmt":"2021-06-08T08:00:42","guid":{"rendered":"https:\/\/db-engineering-consulting.com\/?p=10656"},"modified":"2025-05-07T00:19:45","modified_gmt":"2025-05-07T00:19:45","slug":"duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district","status":"publish","type":"post","link":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/","title":{"rendered":"Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district"},"content":{"rendered":"\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-large\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\"><nav class=\"breadcrumbs\"><div class=\"breadcrumbs__inner\"><a class=\"breadcrumbs__home\" href=\"https:\/\/db-engineering-consulting.com\/en\/\" aria-label=\"Link Home\"><svg class=\"breadcrumbs__home-icon\"><use xlink:href=\"#home\"><\/use><\/svg><\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg> <a data-is-distributor=\"true\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/\">Updates<\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><span class=\"breadcrumbs__actual-page\">Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district<\/span><\/div><\/nav><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"article-header\"><div class=\"article-header__tags\"><a class=\"tag\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/?categories=9\">News<\/a><\/div><h1 class=\"article-header__headline\">Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district<\/h1><div class=\"article-header__date\">June 8, 2021 &#8211; 8:00 am<\/div><\/div>\n\n\n<div class=\"wp-block-dbec-core-sub-headline\"><p class=\"sub-headline\">With its second expansion stage completed at the end of May 2021, Duisburg&#8217;s electronic interlocking (ESTW) has now been fully commissioned. By bringing this system online, DB Engineering &amp; Consulting will be able to ensure higher quality and more flexibility in local and long-distance transportation.<\/p><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1.jpeg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-150x150.jpeg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-300x225.jpeg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-1024x768.jpeg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-520x390.jpeg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-768x576.jpeg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-1280x960.jpeg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1-1920x700.jpeg 640w\" alt=\"Electronic interlocking\" width=\"2048\" height=\"1536\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1.jpeg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Duisburg&#8217;s electronic interlocking<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Carmen Bovens\"><\/div><\/div><figcaption class=\"figure__caption\">Duisburg&#8217;s electronic interlocking<\/figcaption><\/figure><\/div>\n\n\n\n<p>The new interlocking technology will increase capacity and minimize the number of cancelations and delays on one of the busiest rail lines in Europe. The new ESTW electronic interlocking is replacing the old interlockings at Styrum (Ruhr) near M\u00fclheim and Essen-West.<\/p>\n\n\n\n<h2 class=\"wp-block-heading headline-h3\">Compressed work schedule<\/h2>\n\n\n\n<p>Over the past four years, DB Engineering &amp; Consulting has provided <a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/construction-supervision\/\">construction supervision<\/a> services for this major project. As the construction project progressed, the line&#8217;s importance was made clear on many occasions. When the line was closed, rail traffic in the Ruhr district practically came to a standstill. To minimize the project&#8217;s impact on the many rail passengers traveling between Duisburg and Essen, much of the work was completed in big pushes during long work windows when the line was closed. Here, the philosophy was that it was preferable to shut everything down for a relatively short period of time rather than subjecting passengers to months of restricted travel. However, this approach posed a particular challenge because the construction work to be completed by various companies had to be intricately coordinated in advance. The longest shutdown came in the summer of 2019 and lasted six weeks.<\/p>\n\n\n\n<p>In order to bring the new ESTW electronic interlocking online, the vital rail line between Duisburg and Essen had to be completely closed one last time from May 21 to May 26, 2021. As many as 30 construction supervisors at a time helped to guide all of the disciplines involved in the project. To ensure commissioning was successful, the Construction Supervision Center for line upgrades (46\/2) received support from all construction supervision centers in Region West.<\/p>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1.jpeg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-150x150.jpeg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-300x225.jpeg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-1024x768.jpeg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-520x390.jpeg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-768x576.jpeg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-1280x960.jpeg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1-1920x700.jpeg 640w\" alt=\"Electronic interlocking\" width=\"2048\" height=\"1536\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9543._Carmen-Bovens-1.jpeg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Carmen Bovens\"><\/div><\/div><figcaption class=\"figure__caption\">Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district<\/figcaption><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading headline-h3\">Challenging schedule for Duisburg&#8217;s electronic interlocking<\/h2>\n\n\n\n<p>In a mere five days, all of the old signals were removed, new signals and switches were connected to the new system and four new switches were commissioned in Heissen near <a href=\"https:\/\/en.wikipedia.org\/wiki\/M%C3%BClheim\" target=\"_blank\" rel=\"noreferrer noopener\">M\u00fclheim<\/a>. This infrastructure will provide more options for trains traveling and passing one another on this route section \u2013 for instance, the <a href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/the-rhein-ruhr-express-rrx-project-in-north-rhine-westphalia-germany\/\" target=\"_blank\" rel=\"noreferrer noopener\">Rhine Ruhr Express (RRX)<\/a>. In order to test all of the switches and signals in all possible travel configurations, the last step involved making an enormous number of <a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/testing-and-commissioning\/\" target=\"_blank\" rel=\"noreferrer noopener\">commissioning<\/a> runs. Tensions were running high up to the very end because many infrastructure components were only able to undergo initial testing during the brief track closure.<\/p>\n\n\n\n<p>At the same time, the track closure was taken as an opportunity to build two provisional bridges over the A40 highway near Styrum, a district of M\u00fclheim. A major fire broke out at this location in September 2020 after an accident involving a truck; three of five rail bridges sustained severe enough damage that they will have to be demolished and rebuilt. DB Engineering &amp; Consulting has also been able to assist with this complex project by providing occupational health and safety coordination services and logistics services in work windows during track closures.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-2-medium is-offset-left-1-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"wp-block-dbec-core-social-sharing\"><div class=\"social-sharing\" data-subject=\"Here is an article for you: [TITLE]\" data-recipient=\"mail recipient en\" data-body=\"Here is an article by DB Engineering &#038; Consulting for you: [TITLE] at [LINK]\"><span class=\"social-sharing__label\">Share<\/span><div class=\"social-sharing__links\"><a class=\"social-sharing__link social-sharing__link--linkedin\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link LinkedIn\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-linked-in\"\/><\/svg><\/a><a class=\"social-sharing__link social-sharing__link--mail\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link Mail\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-mail\"\/><\/svg><\/a><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h4\">Contact<\/h2>\n\n\n<div class=\"contact-person\"><h3 class=\"contact-person__name\">DB Engineering &#038; Consulting<\/h3><div class=\"contact-person__position\">Team Marketing &#038; Communications<\/div><div class=\"contact-person__address\">DB Engineering &#038; Consulting<br \/>\r\nEUREF-Campus 14<br \/>\r\n10829 Berlin<br \/>\r\nGermany<\/div><a class=\"contact-person__link-communication\" href=\"mailto:marketing@db-eco.com\"><svg class=\"contact-person__icon-mail\"><use xlink:href=\"#icon-mail\"><\/use><\/svg><span>E-Mail<\/span><\/a><\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-large\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-linked-items  wp-block-dbec-core-layout-linked-items--expanded\"><section class=\"layout-linked-items\"><div class=\"layout-linked-items__header\"><div class=\"grid\"><div class=\"column is-6-small is-3-medium\"><h2 class=\"layout-linked-items__headline\">More news<\/h2><\/div><div class=\"column is-6-small is-3-medium\"><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--top\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/news\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/div><\/div><\/div><div class=\"layout-linked-items__inner\"><div class=\"related-posts\"><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/10-years-of-db-ec\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-768x512.jpeg\" class=\"base-card__image wp-post-image\" alt=\"10 years of DB E&amp;C\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-768x512.jpeg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-300x200.jpeg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-1024x682.jpeg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-520x347.jpeg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1.jpeg 1280w\" \/><\/figure><h3 class=\"base-card__title\">10 years of DB Engineering &amp; Consulting<\/h3><div class=\"base-card__date\">04-02-2026<\/div><div class=\"base-card__copy\">From the first sketch to commissioning: DB E&#038;C has been combining expertise and passion for mobility for a decade &#8211; not just in Germany, but worldwide. The anniversary on April 1 marks the beginning of a special journey: digitally, on paper and, above all, together as one.<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/major-design-contract-for-rail-baltica-kaunas-poland-section\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"511\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-768x511.jpg\" class=\"base-card__image wp-post-image\" alt=\"Rail Baltica Kaunas-Poland section: Stefan Geisperger at the signing of the contract\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-768x511.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1024x682.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1536x1022.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-520x346.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1280x852.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger.jpg 1878w\" \/><div class=\"label-reference\" data-image-reference=\"\u017dygimantas Gedvila\"><\/div><\/figure><h3 class=\"base-card__title\">Major Design Contract for Rail Baltica Kaunas-Poland Section<\/h3><div class=\"base-card__date\">08-13-2025<\/div><div class=\"base-card__copy\">DB E&#038;C has secured a significant new contract for the Rail Baltica project, marking another milestone in the company&#8217;s eight-year involvement in this transformative European infrastructure initiative. The contract signing ceremony took place on August 11, 2025, at Kaunas Railway Station, bringing together key stakeholders from Lithuania, Germany, and the Baltic rail industry.<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/florian-exner-ueber-digitale-planung-und-nachhaltige-infrastruktur\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"886\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-768x886.jpg\" class=\"base-card__image wp-post-image\" alt=\"Profilfoto Florian Exner als Expert in Engineering\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-768x886.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-260x300.jpg 260w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-888x1024.jpg 888w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1332x1536.jpg 1332w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1776x2048.jpg 1776w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-520x600.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1280x1476.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1920x2214.jpg 1920w\" \/><div class=\"label-reference\" data-image-reference=\"DB E&#038;C\"><\/div><\/figure><h3 class=\"base-card__title\">Florian Exner on Digital Design und Sustainable Infrastructure<\/h3><div class=\"base-card__date\">07-24-2025<\/div><div class=\"base-card__copy\">Digital technologies, sustainable design and teamwork as a driver of innovation &#8211; these are the topics that play a central role in Florian Exner&#8217;s day-to-day work. As Head of Design Control and Safety Technology at DB E&#038;C, with his team he is shaping the future of rail infrastructure. In this interview, he provides exciting insights into his projects, his day-to-day management work and shows why teamwork and technological innovation are inseparably linked. <\/div><\/a><\/div><\/div><\/div><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--bottom\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/news\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/section><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>With its second expansion stage completed at the end of May 2021, the ESTW electronic interlocking in Duisburg has now been fully commissioned. By bringing this system online, DB Engineering &#038; Consulting will be able to ensure higher quality and more flexibility in local and long-distance transportation.<\/p>\n","protected":false},"author":7,"featured_media":10658,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"allow-other-domains":"1"},"categories":[9],"tags":[351,933,784],"class_list":["post-10656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bauuberwachung","tag-bauueberwachung-en","tag-nahverkehr-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Electronic interlocking ensures higher quality | DB E&amp;C<\/title>\n<meta name=\"description\" content=\"With the commissioning of the Duisburg&#039;s electronic interlocking (ESTW), DB Engineering &amp; Consulting is ensuring greater quality. Learn more!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Duisburg&#039;s electronic interlocking is improving rail transport in Germany&#039;s Ruhr district\" \/>\n<meta property=\"og:description\" content=\"With the commissioning of the Duisburg&#039;s electronic interlocking (ESTW), DB Engineering &amp; Consulting is ensuring greater quality. Learn more!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/\" \/>\n<meta property=\"og:site_name\" content=\"DB Engineering &amp; Consulting\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-08T08:00:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-07T00:19:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Alexandra Scherer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alexandra Scherer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/\"},\"author\":{\"name\":\"Alexandra Scherer\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/person\\\/e6c44f2137bd9d8b85bdce0ceccd8967\"},\"headline\":\"Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district\",\"datePublished\":\"2021-06-08T08:00:42+00:00\",\"dateModified\":\"2025-05-07T00:19:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/\"},\"wordCount\":574,\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/IMG_9526_Carmen-Bovens..jpeg\",\"keywords\":[\"bau\u00fcberwachung\",\"bau\u00fcberwachung\",\"Nahverkehr\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/\",\"name\":\"Electronic interlocking ensures higher quality | DB E&C\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/IMG_9526_Carmen-Bovens..jpeg\",\"datePublished\":\"2021-06-08T08:00:42+00:00\",\"dateModified\":\"2025-05-07T00:19:45+00:00\",\"description\":\"With the commissioning of the Duisburg's electronic interlocking (ESTW), DB Engineering & Consulting is ensuring greater quality. Learn more!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#primaryimage\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/IMG_9526_Carmen-Bovens..jpeg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/IMG_9526_Carmen-Bovens..jpeg\",\"width\":2048,\"height\":1536,\"caption\":\"DB Engineering\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"name\":\"DB Engineering & Consulting\",\"description\":\"Part of DB E.C.O. Group\",\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\",\"name\":\"DB Engineering & Consulting GmbH\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"width\":2560,\"height\":454,\"caption\":\"DB Engineering & Consulting GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/db-engineering-consulting\\\/\"],\"description\":\"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.\",\"email\":\"db-engineering-consulting@db-eco.com\",\"legalName\":\"DB Engineering & Consulting GmbH\",\"foundingDate\":\"1966-05-26\",\"vatID\":\"DE 114 139 523\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"5001\",\"maxValue\":\"10000\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/person\\\/e6c44f2137bd9d8b85bdce0ceccd8967\",\"name\":\"Alexandra Scherer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9f34e8d72ae02fe36a6e6b6550fad84b642b0cd653dfa5c90d3987c17085d375?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9f34e8d72ae02fe36a6e6b6550fad84b642b0cd653dfa5c90d3987c17085d375?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9f34e8d72ae02fe36a6e6b6550fad84b642b0cd653dfa5c90d3987c17085d375?s=96&d=mm&r=g\",\"caption\":\"Alexandra Scherer\"},\"sameAs\":[\"Boglarka Mihaly\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Electronic interlocking ensures higher quality | DB E&C","description":"With the commissioning of the Duisburg's electronic interlocking (ESTW), DB Engineering & Consulting is ensuring greater quality. Learn more!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/","og_locale":"en_US","og_type":"article","og_title":"Duisburg's electronic interlocking is improving rail transport in Germany's Ruhr district","og_description":"With the commissioning of the Duisburg's electronic interlocking (ESTW), DB Engineering & Consulting is ensuring greater quality. Learn more!","og_url":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/","og_site_name":"DB Engineering &amp; Consulting","article_published_time":"2021-06-08T08:00:42+00:00","article_modified_time":"2025-05-07T00:19:45+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg","type":"image\/jpeg"}],"author":"Alexandra Scherer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alexandra Scherer","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#article","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/"},"author":{"name":"Alexandra Scherer","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/person\/e6c44f2137bd9d8b85bdce0ceccd8967"},"headline":"Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district","datePublished":"2021-06-08T08:00:42+00:00","dateModified":"2025-05-07T00:19:45+00:00","mainEntityOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/"},"wordCount":574,"publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg","keywords":["bau\u00fcberwachung","bau\u00fcberwachung","Nahverkehr"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/","url":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/","name":"Electronic interlocking ensures higher quality | DB E&C","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#primaryimage"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg","datePublished":"2021-06-08T08:00:42+00:00","dateModified":"2025-05-07T00:19:45+00:00","description":"With the commissioning of the Duisburg's electronic interlocking (ESTW), DB Engineering & Consulting is ensuring greater quality. Learn more!","breadcrumb":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#primaryimage","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg","width":2048,"height":1536,"caption":"DB Engineering"},{"@type":"BreadcrumbList","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/duisburgs-electronic-interlocking-is-improving-rail-transport-in-germanys-ruhr-district\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/db-engineering-consulting.com\/en\/"},{"@type":"ListItem","position":2,"name":"Duisburg&#8217;s electronic interlocking is improving rail transport in Germany&#8217;s Ruhr district"}]},{"@type":"WebSite","@id":"https:\/\/db-engineering-consulting.com\/en\/#website","url":"https:\/\/db-engineering-consulting.com\/en\/","name":"DB Engineering & Consulting","description":"Part of DB E.C.O. Group","publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/db-engineering-consulting.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/db-engineering-consulting.com\/en\/#organization","name":"DB Engineering & Consulting GmbH","url":"https:\/\/db-engineering-consulting.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","width":2560,"height":454,"caption":"DB Engineering & Consulting GmbH"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/db-engineering-consulting\/"],"description":"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.","email":"db-engineering-consulting@db-eco.com","legalName":"DB Engineering & Consulting GmbH","foundingDate":"1966-05-26","vatID":"DE 114 139 523","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"5001","maxValue":"10000"}},{"@type":"Person","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/person\/e6c44f2137bd9d8b85bdce0ceccd8967","name":"Alexandra Scherer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9f34e8d72ae02fe36a6e6b6550fad84b642b0cd653dfa5c90d3987c17085d375?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9f34e8d72ae02fe36a6e6b6550fad84b642b0cd653dfa5c90d3987c17085d375?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9f34e8d72ae02fe36a6e6b6550fad84b642b0cd653dfa5c90d3987c17085d375?s=96&d=mm&r=g","caption":"Alexandra Scherer"},"sameAs":["Boglarka Mihaly"]}]}},"dbec_featured_media":{"source_url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-300x225.jpeg","source_set":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-300x225.jpeg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1024x768.jpeg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-768x576.jpeg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1536x1152.jpeg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-520x390.jpeg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens.-1280x960.jpeg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2021\/06\/IMG_9526_Carmen-Bovens..jpeg 2048w","caption":"DB Engineering ","alt":"ESTW Duisburg"},"post_views":4155,"_links":{"self":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/10656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/comments?post=10656"}],"version-history":[{"count":3,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/10656\/revisions"}],"predecessor-version":[{"id":27580,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/10656\/revisions\/27580"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media\/10658"}],"wp:attachment":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media?parent=10656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/categories?post=10656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/tags?post=10656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}