{"id":8672,"date":"2020-10-26T21:09:00","date_gmt":"2020-10-26T21:09:00","guid":{"rendered":"https:\/\/db-engineering-consulting.com\/?p=8672"},"modified":"2025-05-07T05:39:36","modified_gmt":"2025-05-07T05:39:36","slug":"sustainable-optimization-of-the-ice-t-fleets-maintenance","status":"publish","type":"post","link":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/","title":{"rendered":"Sustainable optimization of the ICE-T fleet\u00b4s maintenance"},"content":{"rendered":"\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-large\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\"><nav class=\"breadcrumbs\"><div class=\"breadcrumbs__inner\"><a class=\"breadcrumbs__home\" href=\"https:\/\/db-engineering-consulting.com\/en\/\" aria-label=\"Link Home\"><svg class=\"breadcrumbs__home-icon\"><use xlink:href=\"#home\"><\/use><\/svg><\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg> <a data-is-distributor=\"true\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/\">Updates<\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><span class=\"breadcrumbs__actual-page\">Sustainable optimization of the ICE-T fleet\u00b4s maintenance<\/span><\/div><\/nav><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"article-header\"><div class=\"article-header__tags\"><a class=\"tag\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/?categories=9\">News<\/a><\/div><h1 class=\"article-header__headline\">Sustainable optimization of the ICE-T fleet\u00b4s maintenance<\/h1><div class=\"article-header__date\">October 26, 2020 &#8211; 9:09 pm<\/div><\/div>\n\n\n<div class=\"wp-block-dbec-core-sub-headline\"><p class=\"sub-headline\">In September 2019, DB Fernverkehr faced the challenge of having to outsource the revision of its ICE-T fleet at short notice. Thanks to the experts from DB Engineering &amp; Consulting and MSG, the first train was released one year later and a sustainable foundation for future cooperation was laid.<\/p><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-300x225.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-1024x768.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-520x390.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-768x576.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-1280x960.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1-1920x700.jpg 640w\" alt=\"Sustainable Maintenance - ICE-T, BR 411\" width=\"2560\" height=\"1920\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled-1.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Newly painted end car of a 7-part ICE-T, BR 411<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Andreas Stickler\"><\/div><\/div><figcaption class=\"figure__caption\">Newly painted end car of a 7-part ICE-T, BR 411<\/figcaption><\/figure><\/div>\n\n\n\n<p>Successful maintenance is an important success factor for a well functioning railroad operation. In September 2019, the ICE-T fleet management of <a href=\"https:\/\/www.deutschebahn.com\/en\/group\/business_units\/DB_Bahn_Long_Distance-1212406\" target=\"_blank\" rel=\"noreferrer noopener\">DB Fernverkehr<\/a> was told that the inspections planned for 2020 in accordance with \u00a732 EBO (Railway Construction and Operating Regulations), maintenance level &#8220;IS 700&#8221; (inspection after 16 years or 3.3 million km), could not be carried out at the plant of <a href=\"https:\/\/www.db-fzi.com\/fahrzeuginstandhaltung-en\" target=\"_blank\" rel=\"noreferrer noopener\">DB Fahrzeuginstandhaltung<\/a> in Krefeld, Germany. Consequently, the challenge was to find an external solution in the shortest possible time in order to get this measure of heavy maintenance qualified and implemented in a way that was compliant with regulations and procedures: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Furthermore, it was also necessary to ensure the <strong>supply of materials and components<\/strong> for this complex work in a timely and appropriate manner. <\/li>\n\n\n\n<li>At the same time, the <strong>processes, procedures and structures<\/strong> in the external plant had to be registered and adapted so that it was not only possible to lead the first train through production almost on time, but also to feed it back into the plant production after completion with feedback of all work in the Maintenance Management System (SAP-ISI) without losing safety and quality. <\/li>\n\n\n\n<li>A further goal was to <strong>establish process reliability<\/strong> <strong>in the plant<\/strong> for the IS 700 vehicles that would then follow and to guide them through production with a <strong>structured preview<\/strong>.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading headline-h3\">Complex tasks around the ICE-T fleet revision<\/h2>\n\n\n\n<p>A team of experts in project, fleet and maintenance management from DB Engineering &amp; Consulting&#8217;s <a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/consulting\/\" target=\"_blank\" rel=\"noreferrer noopener\">Consulting <\/a>department successfully tackled this complex task as the interface between DB Fernverkehr and the external maintenance company MSG.<\/p>\n\n\n\n<p>8,000 production hours were achieved with more than 1,000 orders in SAP ISI and test runs from Halle to Erfurt and from Erfurt to Weimar in Germany took place. Afterwards, the project participants managed to put the first railcar back into operation, which was put into production without any time lead for organizational preparation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading headline-h3\">Methods of successful implementation<\/h2>\n\n\n\n<div class=\"wp-block-dbec-core-gallery  undefined--expanded\" data-delay=\"4\" data-auto-swipe=\"false\"><div class=\"gallery gallery--bullets-outside\"><div class=\"glide\"><div class=\"glide__track\" data-glide-el=\"track\"><ul class=\"glide__slides\">\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/2_ICE-T-Flotte-1.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/2_ICE-T-Flotte-1-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/2_ICE-T-Flotte-1-300x243.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/2_ICE-T-Flotte-1-520x421.jpg 520w\" alt=\"Sustainable Maintenance -  ICE-T, BR 411 - Paint preparation\" width=\"632\" height=\"512\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/2_ICE-T-Flotte-1.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Paint preparation and front coupling<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Andreas Stickler\"><\/div><\/div><figcaption class=\"slide-image__caption\">Paint preparation and front coupling<\/figcaption><\/figure><\/li>\n\n\n\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-300x225.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-1024x768.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-520x390.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-768x576.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-1280x960.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1-1920x700.jpg 640w\" alt=\"Sustainable Maintenance -  Pronautic cabling\" width=\"2560\" height=\"1920\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200525_134921-scaled-1.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Pronautic cabling on the bogie, upgrading after water ingress<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Andreas Stickler\"><\/div><\/div><figcaption class=\"slide-image__caption\">Pronautic cabling on the bogie, upgrading after water ingress<\/figcaption><\/figure><\/li>\n\n\n\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-300x225.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-1024x768.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-520x390.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-768x576.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-1280x960.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1-1920x700.jpg 640w\" alt=\"Sustainable Maintenance - Reconditioned bogies\" width=\"2560\" height=\"1920\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_113133-scaled-1.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Reconditioned bogies with tilting technology, compact unit<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Andreas Stickler\"><\/div><\/div><figcaption class=\"slide-image__caption\">Reconditioned bogies with tilting technology, compact unit<\/figcaption><\/figure><\/li>\n<\/ul><\/div><div class=\"glide__footer\"><div class=\"glide__play-pause\"><button type=\"button\" class=\"glide__play-pause-button\" aria-label=\"play\/pause automatic swipe\"><svg aria-hidden=\"true\" class=\"controls__icon-pause\"><use xlink:href=\"#icon-pause\" \/><\/svg><svg aria-hidden=\"true\" class=\"controls__icon-play\"><use xlink:href=\"#icon-play-small\" \/><\/svg><\/button><\/div><div class=\"glide__bullets\" data-glide-el=\"controls[nav]\"><button class=\"glide__bullet\" aria-label=\"Go to slide 1\" data-glide-dir=\"=0\"><\/button><button class=\"glide__bullet\" aria-label=\"Go to slide 2\" data-glide-dir=\"=1\"><\/button><button class=\"glide__bullet\" aria-label=\"Go to slide 3\" data-glide-dir=\"=2\"><\/button><\/div><div><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<p>In this project, the consulting team developed and implemented, both for fleet management in Frankfurt am Main and for the MSG production facility in Halle-Ammendorf, procedures and methods for: <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>transparent <strong>production control<\/strong><\/li>\n\n\n\n<li>active and target-oriented <strong>communication<\/strong> between the parties involved<\/li>\n\n\n\n<li><strong>centralized data storage<\/strong> in a common data room<\/li>\n\n\n\n<li><strong>control in SAP ISI<\/strong> for production and controlling <\/li>\n<\/ul>\n\n\n\n<p>Furthermore, concepts for the rule-compliant proof of work in accordance with the principles of railroad safety were developed.<\/p>\n\n\n\n<p>Our experts thus not only contributed to the completion of the first ICE-T in top quality, but also to the establishment of sustainable processes that ensure plannable maintenance execution and &#8211; if necessary &#8211; the basis for the successful further outsourcing of maintenance services.<\/p>\n\n\n\n<h2 class=\"wp-block-heading headline-h3\">Curious about our work?<\/h2>\n\n\n\n<div class=\"wp-block-dbec-core-text-image-teaser  text-image-teaser--align-image-right\"><div class=\"text-image-teaser text-image-teaser--align-image-right text-image-teaser--fade-in-static\"><div class=\"grid\"><div class=\"column is-6-small is-4-medium text-image-teaser__column-image\"><div class=\"text-image-teaser__wrapper-media\"><\/div><\/div><div class=\"column is-6-small is-2-medium text-image-teaser__column-text\"><div class=\"text-image-teaser__container-text\"><a class=\"base-button base-button--ghost\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/?dbec_product=41&amp;actual_page=1\" target=\"_self\" rel=\"noopener noreferrer\"><span class=\"base-button__label\">Learn more about our consulting projects<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-2-medium is-offset-left-1-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"wp-block-dbec-core-social-sharing\"><div class=\"social-sharing\" data-subject=\"Here is an article for you: [TITLE]\" data-recipient=\"mail recipient en\" data-body=\"Here is an article by DB Engineering &#038; Consulting for you: [TITLE] at [LINK]\"><span class=\"social-sharing__label\">Share<\/span><div class=\"social-sharing__links\"><a class=\"social-sharing__link social-sharing__link--linkedin\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link LinkedIn\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-linked-in\"\/><\/svg><\/a><a class=\"social-sharing__link social-sharing__link--mail\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link Mail\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-mail\"\/><\/svg><\/a><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h4\">Contact<\/h2>\n\n\n<div class=\"contact-person\"><h3 class=\"contact-person__name\">DB Engineering &#038; Consulting<\/h3><div class=\"contact-person__position\">Team Marketing &#038; Communications<\/div><div class=\"contact-person__address\">DB Engineering &#038; Consulting<br \/>\r\nEUREF-Campus 14<br \/>\r\n10829 Berlin<br \/>\r\nGermany<\/div><a class=\"contact-person__link-communication\" href=\"mailto:marketing@db-eco.com\"><svg class=\"contact-person__icon-mail\"><use xlink:href=\"#icon-mail\"><\/use><\/svg><span>E-Mail<\/span><\/a><\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-large\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-linked-items  wp-block-dbec-core-layout-linked-items--expanded\"><section class=\"layout-linked-items\"><div class=\"layout-linked-items__header\"><div class=\"grid\"><div class=\"column is-6-small is-3-medium\"><h2 class=\"layout-linked-items__headline\">More news<\/h2><\/div><div class=\"column is-6-small is-3-medium\"><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--top\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/news\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/div><\/div><\/div><div class=\"layout-linked-items__inner\"><div class=\"related-posts\"><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/10-years-of-db-ec\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-768x512.jpeg\" class=\"base-card__image wp-post-image\" alt=\"10 years of DB E&amp;C\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-768x512.jpeg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-300x200.jpeg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-1024x682.jpeg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-520x347.jpeg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1.jpeg 1280w\" \/><\/figure><h3 class=\"base-card__title\">10 years of DB Engineering &amp; Consulting<\/h3><div class=\"base-card__date\">04-02-2026<\/div><div class=\"base-card__copy\">From the first sketch to commissioning: DB E&#038;C has been combining expertise and passion for mobility for a decade &#8211; not just in Germany, but worldwide. The anniversary on April 1 marks the beginning of a special journey: digitally, on paper and, above all, together as one.<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/major-design-contract-for-rail-baltica-kaunas-poland-section\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"511\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-768x511.jpg\" class=\"base-card__image wp-post-image\" alt=\"Rail Baltica Kaunas-Poland section: Stefan Geisperger at the signing of the contract\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-768x511.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1024x682.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1536x1022.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-520x346.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1280x852.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger.jpg 1878w\" \/><div class=\"label-reference\" data-image-reference=\"\u017dygimantas Gedvila\"><\/div><\/figure><h3 class=\"base-card__title\">Major Design Contract for Rail Baltica Kaunas-Poland Section<\/h3><div class=\"base-card__date\">08-13-2025<\/div><div class=\"base-card__copy\">DB E&#038;C has secured a significant new contract for the Rail Baltica project, marking another milestone in the company&#8217;s eight-year involvement in this transformative European infrastructure initiative. The contract signing ceremony took place on August 11, 2025, at Kaunas Railway Station, bringing together key stakeholders from Lithuania, Germany, and the Baltic rail industry.<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/florian-exner-ueber-digitale-planung-und-nachhaltige-infrastruktur\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"886\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-768x886.jpg\" class=\"base-card__image wp-post-image\" alt=\"Profilfoto Florian Exner als Expert in Engineering\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-768x886.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-260x300.jpg 260w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-888x1024.jpg 888w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1332x1536.jpg 1332w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1776x2048.jpg 1776w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-520x600.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1280x1476.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1920x2214.jpg 1920w\" \/><div class=\"label-reference\" data-image-reference=\"DB E&#038;C\"><\/div><\/figure><h3 class=\"base-card__title\">Florian Exner on Digital Design und Sustainable Infrastructure<\/h3><div class=\"base-card__date\">07-24-2025<\/div><div class=\"base-card__copy\">Digital technologies, sustainable design and teamwork as a driver of innovation &#8211; these are the topics that play a central role in Florian Exner&#8217;s day-to-day work. As Head of Design Control and Safety Technology at DB E&#038;C, with his team he is shaping the future of rail infrastructure. In this interview, he provides exciting insights into his projects, his day-to-day management work and shows why teamwork and technological innovation are inseparably linked. <\/div><\/a><\/div><\/div><\/div><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--bottom\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/news\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/section><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Last year, DB Fernverkehr faced the challenge of having to outsource the revision of its ICE-T fleet. One year later, the first train has now been released.<\/p>\n","protected":false},"author":1,"featured_media":8610,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"allow-other-domains":"1"},"categories":[9],"tags":[],"class_list":["post-8672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sustainable maintenance of the ICE-T fleet | DB E&amp;C<\/title>\n<meta name=\"description\" content=\"Sustainable maintenance is becoming an important success factor for a well functioning railroad operation system. Read more in our article!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sustainable optimization of the ICE-T fleet\u00b4s maintenance\" \/>\n<meta property=\"og:description\" content=\"Sustainable maintenance is becoming an important success factor for a well functioning railroad operation system. Read more in our article!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"DB Engineering &amp; Consulting\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-26T21:09:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-07T05:39:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ec-schovo-admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ec-schovo-admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/\"},\"author\":{\"name\":\"ec-schovo-admin\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/person\\\/fe8879c3ec36f725bacd04000a15a3e9\"},\"headline\":\"Sustainable optimization of the ICE-T fleet\u00b4s maintenance\",\"datePublished\":\"2020-10-26T21:09:00+00:00\",\"dateModified\":\"2025-05-07T05:39:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/\"},\"wordCount\":566,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/20200311_124305-scaled.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/\",\"name\":\"Sustainable maintenance of the ICE-T fleet | DB E&C\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/20200311_124305-scaled.jpg\",\"datePublished\":\"2020-10-26T21:09:00+00:00\",\"dateModified\":\"2025-05-07T05:39:36+00:00\",\"description\":\"Sustainable maintenance is becoming an important success factor for a well functioning railroad operation system. Read more in our article!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/20200311_124305-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/20200311_124305-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"DB Engineering & Consulting \\\/ Andreas Stickler\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/sustainable-optimization-of-the-ice-t-fleets-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sustainable optimization of the ICE-T fleet\u00b4s maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"name\":\"DB Engineering & Consulting\",\"description\":\"Part of DB E.C.O. Group\",\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\",\"name\":\"DB Engineering & Consulting GmbH\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"width\":2560,\"height\":454,\"caption\":\"DB Engineering & Consulting GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/db-engineering-consulting\\\/\"],\"description\":\"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.\",\"email\":\"db-engineering-consulting@db-eco.com\",\"legalName\":\"DB Engineering & Consulting GmbH\",\"foundingDate\":\"1966-05-26\",\"vatID\":\"DE 114 139 523\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"5001\",\"maxValue\":\"10000\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/person\\\/fe8879c3ec36f725bacd04000a15a3e9\",\"name\":\"ec-schovo-admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a72cca05f13f748797a78d2612434ed79865c4bbf86f2ecd1870429aa2b2e83d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a72cca05f13f748797a78d2612434ed79865c4bbf86f2ecd1870429aa2b2e83d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a72cca05f13f748797a78d2612434ed79865c4bbf86f2ecd1870429aa2b2e83d?s=96&d=mm&r=g\",\"caption\":\"ec-schovo-admin\"},\"sameAs\":[\"https:\\\/\\\/s-v.de\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sustainable maintenance of the ICE-T fleet | DB E&C","description":"Sustainable maintenance is becoming an important success factor for a well functioning railroad operation system. Read more in our article!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"Sustainable optimization of the ICE-T fleet\u00b4s maintenance","og_description":"Sustainable maintenance is becoming an important success factor for a well functioning railroad operation system. Read more in our article!","og_url":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/","og_site_name":"DB Engineering &amp; Consulting","article_published_time":"2020-10-26T21:09:00+00:00","article_modified_time":"2025-05-07T05:39:36+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled.jpg","type":"image\/jpeg"}],"author":"ec-schovo-admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ec-schovo-admin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#article","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/"},"author":{"name":"ec-schovo-admin","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/person\/fe8879c3ec36f725bacd04000a15a3e9"},"headline":"Sustainable optimization of the ICE-T fleet\u00b4s maintenance","datePublished":"2020-10-26T21:09:00+00:00","dateModified":"2025-05-07T05:39:36+00:00","mainEntityOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/"},"wordCount":566,"commentCount":0,"publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/","url":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/","name":"Sustainable maintenance of the ICE-T fleet | DB E&C","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled.jpg","datePublished":"2020-10-26T21:09:00+00:00","dateModified":"2025-05-07T05:39:36+00:00","description":"Sustainable maintenance is becoming an important success factor for a well functioning railroad operation system. Read more in our article!","breadcrumb":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#primaryimage","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-scaled.jpg","width":2560,"height":1920,"caption":"DB Engineering & Consulting \/ Andreas Stickler"},{"@type":"BreadcrumbList","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/sustainable-optimization-of-the-ice-t-fleets-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/db-engineering-consulting.com\/en\/"},{"@type":"ListItem","position":2,"name":"Sustainable optimization of the ICE-T fleet\u00b4s maintenance"}]},{"@type":"WebSite","@id":"https:\/\/db-engineering-consulting.com\/en\/#website","url":"https:\/\/db-engineering-consulting.com\/en\/","name":"DB Engineering & Consulting","description":"Part of DB E.C.O. Group","publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/db-engineering-consulting.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/db-engineering-consulting.com\/en\/#organization","name":"DB Engineering & Consulting GmbH","url":"https:\/\/db-engineering-consulting.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","width":2560,"height":454,"caption":"DB Engineering & Consulting GmbH"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/db-engineering-consulting\/"],"description":"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.","email":"db-engineering-consulting@db-eco.com","legalName":"DB Engineering & Consulting GmbH","foundingDate":"1966-05-26","vatID":"DE 114 139 523","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"5001","maxValue":"10000"}},{"@type":"Person","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/person\/fe8879c3ec36f725bacd04000a15a3e9","name":"ec-schovo-admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a72cca05f13f748797a78d2612434ed79865c4bbf86f2ecd1870429aa2b2e83d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a72cca05f13f748797a78d2612434ed79865c4bbf86f2ecd1870429aa2b2e83d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a72cca05f13f748797a78d2612434ed79865c4bbf86f2ecd1870429aa2b2e83d?s=96&d=mm&r=g","caption":"ec-schovo-admin"},"sameAs":["https:\/\/s-v.de"]}]}},"dbec_featured_media":{"source_url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-300x225.jpg","source_set":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-300x225.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-1024x768.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-768x576.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-1536x1152.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-2048x1536.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-520x390.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/10\/20200311_124305-1280x960.jpg 1280w","caption":"DB Engineering & Consulting \/ Andreas Stickler","alt":"Neu lackierter Endwagen eines 7 teiligen ICE-T, BR 411"},"post_views":4668,"_links":{"self":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/8672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/comments?post=8672"}],"version-history":[{"count":3,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/8672\/revisions"}],"predecessor-version":[{"id":27625,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/8672\/revisions\/27625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media\/8610"}],"wp:attachment":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media?parent=8672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/categories?post=8672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/tags?post=8672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}