{"id":8723,"date":"2020-11-09T14:52:07","date_gmt":"2020-11-09T14:52:07","guid":{"rendered":"https:\/\/db-engineering-consulting.com\/?p=8723"},"modified":"2025-05-07T05:39:30","modified_gmt":"2025-05-07T05:39:30","slug":"railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns","status":"publish","type":"post","link":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/","title":{"rendered":"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns"},"content":{"rendered":"\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-large\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\"><nav class=\"breadcrumbs\"><div class=\"breadcrumbs__inner\"><a class=\"breadcrumbs__home\" href=\"https:\/\/db-engineering-consulting.com\/en\/\" aria-label=\"Link Home\"><svg class=\"breadcrumbs__home-icon\"><use xlink:href=\"#home\"><\/use><\/svg><\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg> <a data-is-distributor=\"true\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/\">Updates<\/a> <svg class=\"breadcrumbs__delimiter\"><use xlink:href=\"#icon-arrow-right\"><\/use><\/svg><span class=\"breadcrumbs__actual-page\">Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns<\/span><\/div><\/nav><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-small layout-grid--expanded\"><div class=\"grid grid--child-margin-small\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-3-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"article-header\"><div class=\"article-header__tags\"><a class=\"tag\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/?categories=9\">News<\/a><\/div><h1 class=\"article-header__headline\">Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns<\/h1><div class=\"article-header__date\">November 9, 2020 &#8211; 2:52 pm<\/div><\/div>\n\n\n<div class=\"wp-block-dbec-core-sub-headline\"><p class=\"sub-headline\">Joining forces to bring the project to a successful conclusion: Just in time for the opening of the new airport Berlin Brandenburg (BER) &#8220;Willy Brandt&#8221;, the airport express FEX hast started rolling over the railway overpass of the major &#8220;Ostkreuz&#8221; project in October.<\/p><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-figure\"><figure class=\"figure\"><div class=\"figure__inner\"><img decoding=\"async\" class=\"figure__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-300x180.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-1024x614.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-520x312.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-768x461.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-1280x768.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1-1920x700.jpg 640w\" alt=\"New bridge construction - Railway overpass Ostkreuz - rapid transit tracks\" width=\"2560\" height=\"1536\" loading=\"lazy\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Reconstruction of the rapid transit tracks<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting\"><\/div><\/div><figcaption class=\"figure__caption\">Reconstruction of the rapid transit tracks<\/figcaption><\/figure><\/div>\n\n\n\n<p>The replacement of the four-track railway overpass is a component measure in the major &#8220;Ostkreuz&#8221; project. Starting in October, the airport express FEX has started rolling over it from Berlin main station via the Gesundbrunnen station to the <a rel=\"noreferrer noopener\" href=\"https:\/\/ber.berlin-airport.de\/en.html\" target=\"_blank\">new Berlin Brandenburg Airport (BER) &#8220;Willy Brandt&#8221;<\/a>. It also accommodates the high-traffic rapid transit line on the Berlin Ring between the stations Frankfurter Allee and Ostkreuz. For this reason, certain work here was only possible during off-hours with consistent adherence to the revised construction schedule.<\/p>\n\n\n\n<p>In addition to the standard tasks of <a href=\"https:\/\/db-engineering-consulting.com\/en\/productportfolio\/supervision\/\" target=\"_blank\" rel=\"noreferrer noopener\">construction supervision<\/a>, the project team of DB Engineering &amp; Consulting provided intensive support in the development of technically feasible solutions and in organizational issues. This became necessary because it became apparent during the construction phase that the selected construction methods were unsuitable in view of the existing subsoil and the nearby building boundaries.<\/p>\n\n\n\n<p>The project comprised the renewal of the bridge and the track, the erection of three retaining walls and signal brackets, the corresponding adaptation of the power supply systems (15 kV 16&nbsp;2\/3 Hz contact line and 750 V DC side-current rail), the control and safety technology as well as the implementation of further measures.<\/p>\n\n\n\n<div class=\"wp-block-dbec-core-gallery  undefined--expanded\" data-delay=\"4\" data-auto-swipe=\"false\"><div class=\"gallery gallery--bullets-outside gallery--static\"><div class=\"glide\"><div class=\"glide__track\" data-glide-el=\"track\"><ul class=\"glide__slides\">\n<li class=\"wp-block-dbec-core-slide-image  glide__slide\"><figure class=\"slide-image slide-image--ratio-3-2\"><div class=\"slide-image__wrapper-image\"><img loading=\"lazy\" decoding=\"async\" class=\"slide-image__image\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1.jpg\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-150x150.jpg 150w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-300x225.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-1024x768.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-520x390.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-768x576.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-1280x960.jpg 640w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1-1600x700.jpg 640w\" alt=\"New bridge construction - Railway overpass Ostkreuz - provisional bridge\" width=\"1600\" height=\"1200\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\"\/><div class=\"enlarge-image\"><template data-name=\"lightbox-content\"><div class=\"lightbox-image\"><div class=\"lightbox-image__image\" style=\"background-image:url(&quot;https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_5-1.jpg&quot;)\"><\/div><div class=\"lightbox-image__caption\"><span>Excavating of the provisional bridge in the northern directional track of the rapid transit line<\/span><\/div><\/div><\/template><\/div><div class=\"label-reference\" data-image-reference=\"DB Engineering &amp; Consulting \/ Demid Petrov\"><\/div><\/div><figcaption class=\"slide-image__caption\">Excavating of the provisional bridge in the northern directional track of the rapid transit line<\/figcaption><\/figure><\/li>\n<\/ul><\/div><div class=\"glide__footer\"><div class=\"glide__play-pause\"><button type=\"button\" class=\"glide__play-pause-button\" aria-label=\"play\/pause automatic swipe\"><svg aria-hidden=\"true\" class=\"controls__icon-pause\"><use xlink:href=\"#icon-pause\" \/><\/svg><svg aria-hidden=\"true\" class=\"controls__icon-play\"><use xlink:href=\"#icon-play-small\" \/><\/svg><\/button><\/div><div class=\"glide__bullets\" data-glide-el=\"controls[nav]\"><button class=\"glide__bullet\" aria-label=\"Go to slide 1\" data-glide-dir=\"=0\"><\/button><\/div><div><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<p>With the beginning of the construction work it became clear to all project participants: The project is not going to &#8220;run by itself&#8221;! The influences of the nearby urban development up to almost the embankment base and the high strata water situation were not taken into consideration sufficiently. In view of the numerous obstacles in the ground, the low-vibration pressing method was not suitable for installing the steel sheet pile walls. As an alternative, a vibrating pile driver with replacement bores was chosen, whereby these were not executed in the lock area but in the entire profile area. In order to control the condition of the residential and commercial buildings during the vibration work, our construction supervision team has proposed the monitoring of the vibration and subsidence in order to guarantee the stability at any time.<\/p>\n\n\n\n<div class=\"wp-block-dbec-core-text-image-teaser  text-image-teaser--align-image-right\"><div class=\"text-image-teaser text-image-teaser--align-image-right text-image-teaser--fade-in-static\"><div class=\"grid\"><div class=\"column is-6-small is-4-medium text-image-teaser__column-image\"><div class=\"text-image-teaser__wrapper-media\"><\/div><\/div><div class=\"column is-6-small is-2-medium text-image-teaser__column-text\"><div class=\"text-image-teaser__container-text\"><a class=\"base-button base-button--ghost\" href=\"https:\/\/db-engineering-consulting.com\/en\/projects\/?dbec_product=43&#038;actual_page=1\" target=\"_blank\" rel=\"noopener noreferrer\"><span class=\"base-button__label\">Learn more about our construction supervision projects<\/span><svg class=\"base-button__icon\"><use xlink:href=\"#icon-link\" \/><\/svg><\/a><\/div><\/div><\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-2-medium is-offset-left-1-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\"><div class=\"wp-block-dbec-core-social-sharing\"><div class=\"social-sharing\" data-subject=\"Here is an article for you: [TITLE]\" data-recipient=\"mail recipient en\" data-body=\"Here is an article by DB Engineering &#038; Consulting for you: [TITLE] at [LINK]\"><span class=\"social-sharing__label\">Share<\/span><div class=\"social-sharing__links\"><a class=\"social-sharing__link social-sharing__link--linkedin\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link LinkedIn\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-linked-in\"\/><\/svg><\/a><a class=\"social-sharing__link social-sharing__link--mail\" href=\"\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"Link Mail\"><svg class=\"social-sharing__icon\"><use xlink:href=\"#icon-mail\"\/><\/svg><\/a><\/div><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-text  wp-block-dbec-core-layout-text--expanded\"><div class=\"layout-column layout-column--text\">\n<h2 class=\"wp-block-heading headline-h4\">Contact<\/h2>\n\n\n<div class=\"contact-person\"><h3 class=\"contact-person__name\">DB Engineering &#038; Consulting<\/h3><div class=\"contact-person__position\">Team Marketing &#038; Communications<\/div><div class=\"contact-person__address\">DB Engineering &#038; Consulting<br \/>\r\nEUREF-Campus 14<br \/>\r\n10829 Berlin<br \/>\r\nGermany<\/div><a class=\"contact-person__link-communication\" href=\"mailto:marketing@db-eco.com\"><svg class=\"contact-person__icon-mail\"><use xlink:href=\"#icon-mail\"><\/use><\/svg><span>E-Mail<\/span><\/a><\/div><\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-dbec-core-layout-grid  layout-grid layout-grid--outer-margin-large layout-grid--expanded\"><div class=\"grid grid--child-margin-large\">\n<div class=\"wp-block-dbec-core-layout-column  column is-6-small is-6-medium column--expanded\"><div class=\"layout-column\">\n<div class=\"wp-block-dbec-core-layout-linked-items  wp-block-dbec-core-layout-linked-items--expanded\"><section class=\"layout-linked-items\"><div class=\"layout-linked-items__header\"><div class=\"grid\"><div class=\"column is-6-small is-3-medium\"><h2 class=\"layout-linked-items__headline\">Further news<\/h2><\/div><div class=\"column is-6-small is-3-medium\"><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--top\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/news\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/div><\/div><\/div><div class=\"layout-linked-items__inner\"><div class=\"related-posts\"><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/10-years-of-db-ec\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"512\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-768x512.jpeg\" class=\"base-card__image wp-post-image\" alt=\"10 years of DB E&amp;C\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-768x512.jpeg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-300x200.jpeg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-1024x682.jpeg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1-520x347.jpeg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2026\/04\/Foto-10-Jahre-fuer-Druck-1-1.jpeg 1280w\" \/><\/figure><h3 class=\"base-card__title\">10 years of DB Engineering &amp; Consulting<\/h3><div class=\"base-card__date\">04-02-2026<\/div><div class=\"base-card__copy\">From the first sketch to commissioning: DB E&#038;C has been combining expertise and passion for mobility for a decade &#8211; not just in Germany, but worldwide. The anniversary on April 1 marks the beginning of a special journey: digitally, on paper and, above all, together as one.<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/major-design-contract-for-rail-baltica-kaunas-poland-section\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"511\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-768x511.jpg\" class=\"base-card__image wp-post-image\" alt=\"Rail Baltica Kaunas-Poland section: Stefan Geisperger at the signing of the contract\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-768x511.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-300x200.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1024x682.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1536x1022.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-520x346.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger-1280x852.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/08\/Rail-Baltica-Kaunas-Poland-Section_design-contract-Stefan-Geisperger.jpg 1878w\" \/><div class=\"label-reference\" data-image-reference=\"\u017dygimantas Gedvila\"><\/div><\/figure><h3 class=\"base-card__title\">Major Design Contract for Rail Baltica Kaunas-Poland Section<\/h3><div class=\"base-card__date\">08-13-2025<\/div><div class=\"base-card__copy\">DB E&#038;C has secured a significant new contract for the Rail Baltica project, marking another milestone in the company&#8217;s eight-year involvement in this transformative European infrastructure initiative. The contract signing ceremony took place on August 11, 2025, at Kaunas Railway Station, bringing together key stakeholders from Lithuania, Germany, and the Baltic rail industry.<\/div><\/a><\/div><div class=\"related-posts__post\"><a class=\"base-card\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/florian-exner-ueber-digitale-planung-und-nachhaltige-infrastruktur\/\"><figure class=\"base-card__figure\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"886\" src=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-768x886.jpg\" class=\"base-card__image wp-post-image\" alt=\"Profilfoto Florian Exner als Expert in Engineering\" sizes=\"auto, (min-width: 1330px) calc(((1200px - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 1024px) calc((((100vw - 130px) - 35px * 5) * (2 \/ 6)) + (35px * (2 - 1))), (min-width: 768px) calc((((100vw - 130px) - 35px * 5) * (3 \/ 6)) + (35px * (3 - 1))), calc(100vw - 60px)\" srcset=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-768x886.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-260x300.jpg 260w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-888x1024.jpg 888w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1332x1536.jpg 1332w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1776x2048.jpg 1776w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-520x600.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1280x1476.jpg 1280w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2025\/07\/Florian_Exner_digitale_Planung-1920x2214.jpg 1920w\" \/><div class=\"label-reference\" data-image-reference=\"DB E&#038;C\"><\/div><\/figure><h3 class=\"base-card__title\">Florian Exner on Digital Design und Sustainable Infrastructure<\/h3><div class=\"base-card__date\">07-24-2025<\/div><div class=\"base-card__copy\">Digital technologies, sustainable design and teamwork as a driver of innovation &#8211; these are the topics that play a central role in Florian Exner&#8217;s day-to-day work. As Head of Design Control and Safety Technology at DB E&#038;C, with his team he is shaping the future of rail infrastructure. In this interview, he provides exciting insights into his projects, his day-to-day management work and shows why teamwork and technological innovation are inseparably linked. <\/div><\/a><\/div><\/div><\/div><div class=\"layout-linked-items__wrapper-link layout-linked-items__wrapper-link--bottom\"><a class=\"layout-linked-items__link\" href=\"https:\/\/db-engineering-consulting.com\/en\/news\/\" target=\"_self\" rel=\"noopener noreferrer\">Back to overview page<\/a><\/div><\/section><\/div>\n<\/div><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Just in time for the opening of the new airport Berlin Brandenburg (BER) &#8220;Willy Brandt&#8221;, the airport express FEX has started rolling over the railway overpass of the major &#8220;Ostkreuz&#8221; project from October.<\/p>\n","protected":false},"author":5,"featured_media":8725,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"allow-other-domains":"1"},"categories":[9],"tags":[747],"class_list":["post-8723","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-flughafen-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.0 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Bridge construction: railway overpass Berlin Ostkreuz, Germany | DB E&amp;C<\/title>\n<meta name=\"description\" content=\"The new bridge construction has been successfully accomplished. In time for the opening of the new BER airport in October 2020. Read more!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns\" \/>\n<meta property=\"og:description\" content=\"The new bridge construction has been successfully accomplished. In time for the opening of the new BER airport in October 2020. Read more!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/\" \/>\n<meta property=\"og:site_name\" content=\"DB Engineering &amp; Consulting\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-09T14:52:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-07T05:39:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1024x614.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"614\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Boglarka Mihaly\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Boglarka Mihaly\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/\"},\"author\":{\"name\":\"Boglarka Mihaly\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/person\\\/ccd633f33970d5449704517522e46377\"},\"headline\":\"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns\",\"datePublished\":\"2020-11-09T14:52:07+00:00\",\"dateModified\":\"2025-05-07T05:39:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/\"},\"wordCount\":444,\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/EUe-Wiesenweg_Berlin_7.jpg\",\"keywords\":[\"flughafen\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/\",\"name\":\"Bridge construction: railway overpass Berlin Ostkreuz, Germany | DB E&C\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/EUe-Wiesenweg_Berlin_7.jpg\",\"datePublished\":\"2020-11-09T14:52:07+00:00\",\"dateModified\":\"2025-05-07T05:39:30+00:00\",\"description\":\"The new bridge construction has been successfully accomplished. In time for the opening of the new BER airport in October 2020. Read more!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#primaryimage\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/EUe-Wiesenweg_Berlin_7.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/EUe-Wiesenweg_Berlin_7.jpg\",\"width\":2560,\"height\":1536,\"caption\":\"DB Engineering & Consulting\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/updates\\\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"name\":\"DB Engineering & Consulting\",\"description\":\"Part of DB E.C.O. Group\",\"publisher\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#organization\",\"name\":\"DB Engineering & Consulting GmbH\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/db-engineering-consulting.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg\",\"width\":2560,\"height\":454,\"caption\":\"DB Engineering & Consulting GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/db-engineering-consulting\\\/\"],\"description\":\"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.\",\"email\":\"db-engineering-consulting@db-eco.com\",\"legalName\":\"DB Engineering & Consulting GmbH\",\"foundingDate\":\"1966-05-26\",\"vatID\":\"DE 114 139 523\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"5001\",\"maxValue\":\"10000\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/db-engineering-consulting.com\\\/en\\\/#\\\/schema\\\/person\\\/ccd633f33970d5449704517522e46377\",\"name\":\"Boglarka Mihaly\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0ecaf30e13847ad668da43e783b188af9b009781e2887e15014ff8a4f82e5651?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0ecaf30e13847ad668da43e783b188af9b009781e2887e15014ff8a4f82e5651?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0ecaf30e13847ad668da43e783b188af9b009781e2887e15014ff8a4f82e5651?s=96&d=mm&r=g\",\"caption\":\"Boglarka Mihaly\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Bridge construction: railway overpass Berlin Ostkreuz, Germany | DB E&C","description":"The new bridge construction has been successfully accomplished. In time for the opening of the new BER airport in October 2020. Read more!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/","og_locale":"en_US","og_type":"article","og_title":"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns","og_description":"The new bridge construction has been successfully accomplished. In time for the opening of the new BER airport in October 2020. Read more!","og_url":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/","og_site_name":"DB Engineering &amp; Consulting","article_published_time":"2020-11-09T14:52:07+00:00","article_modified_time":"2025-05-07T05:39:30+00:00","og_image":[{"width":1024,"height":614,"url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1024x614.jpg","type":"image\/jpeg"}],"author":"Boglarka Mihaly","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Boglarka Mihaly","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#article","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/"},"author":{"name":"Boglarka Mihaly","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/person\/ccd633f33970d5449704517522e46377"},"headline":"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns","datePublished":"2020-11-09T14:52:07+00:00","dateModified":"2025-05-07T05:39:30+00:00","mainEntityOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/"},"wordCount":444,"publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7.jpg","keywords":["flughafen"],"articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/","url":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/","name":"Bridge construction: railway overpass Berlin Ostkreuz, Germany | DB E&C","isPartOf":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#primaryimage"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#primaryimage"},"thumbnailUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7.jpg","datePublished":"2020-11-09T14:52:07+00:00","dateModified":"2025-05-07T05:39:30+00:00","description":"The new bridge construction has been successfully accomplished. In time for the opening of the new BER airport in October 2020. Read more!","breadcrumb":{"@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#primaryimage","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7.jpg","width":2560,"height":1536,"caption":"DB Engineering & Consulting"},{"@type":"BreadcrumbList","@id":"https:\/\/db-engineering-consulting.com\/en\/updates\/railway-overpass-ostkreuz-new-bridge-construction-in-berlin-with-some-unknowns\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/db-engineering-consulting.com\/en\/"},{"@type":"ListItem","position":2,"name":"Railway overpass Ostkreuz: New bridge construction in Berlin with some unknowns"}]},{"@type":"WebSite","@id":"https:\/\/db-engineering-consulting.com\/en\/#website","url":"https:\/\/db-engineering-consulting.com\/en\/","name":"DB Engineering & Consulting","description":"Part of DB E.C.O. Group","publisher":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/db-engineering-consulting.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/db-engineering-consulting.com\/en\/#organization","name":"DB Engineering & Consulting GmbH","url":"https:\/\/db-engineering-consulting.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","contentUrl":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2022\/10\/Logo_DB-EC-Part-of-ECO-Group-scaled.jpg","width":2560,"height":454,"caption":"DB Engineering & Consulting GmbH"},"image":{"@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/db-engineering-consulting\/"],"description":"DB Engineering & Consulting ist als Teil des integrierten Bahn-, Mobilit\u00e4ts- und Logistikkonzerns Deutsche Bahn in der Lage, das technische und betriebliche Fachwissen der DB national und international bereitzustellen. Das Unternehmen plant und realisiert komplexe, anforderungsgerechte Infrastruktur-, Mobilit\u00e4ts- und Transportl\u00f6sungen. Dabei stehen nachhaltige Konzepte im Fokus, die zur wirtschaftlichen Entwicklung von Regionen, zum Umweltschutz sowie zur Weiterentwicklung zukunftsf\u00e4higer Mobilit\u00e4t beitragen. Seit 1966 ist DB Engineering & Consulting in \u00fcber 100 L\u00e4ndern t\u00e4tig und hat Projekte in unterschiedlichsten Gr\u00f6\u00dfenordnungen umgesetzt. Mit mehr als 6.100 Mitarbeitenden aus 89 Nationen bringt das Unternehmen fachliche Kompetenz und interkulturelle Erfahrung in s\u00e4mtliche Projektphasen ein.","email":"db-engineering-consulting@db-eco.com","legalName":"DB Engineering & Consulting GmbH","foundingDate":"1966-05-26","vatID":"DE 114 139 523","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"5001","maxValue":"10000"}},{"@type":"Person","@id":"https:\/\/db-engineering-consulting.com\/en\/#\/schema\/person\/ccd633f33970d5449704517522e46377","name":"Boglarka Mihaly","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0ecaf30e13847ad668da43e783b188af9b009781e2887e15014ff8a4f82e5651?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0ecaf30e13847ad668da43e783b188af9b009781e2887e15014ff8a4f82e5651?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0ecaf30e13847ad668da43e783b188af9b009781e2887e15014ff8a4f82e5651?s=96&d=mm&r=g","caption":"Boglarka Mihaly"}}]}},"dbec_featured_media":{"source_url":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-300x180.jpg","source_set":"https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-300x180.jpg 300w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1024x614.jpg 1024w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-768x461.jpg 768w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1536x922.jpg 1536w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-2048x1229.jpg 2048w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-520x312.jpg 520w, https:\/\/db-engineering-consulting.com\/wp-content\/uploads\/2020\/11\/EUe-Wiesenweg_Berlin_7-1280x768.jpg 1280w","caption":"DB Engineering & Consulting","alt":"Eisenbahn\u00fcberf\u00fchrung Ostkreuz"},"post_views":4293,"_links":{"self":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/8723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/comments?post=8723"}],"version-history":[{"count":4,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/8723\/revisions"}],"predecessor-version":[{"id":27623,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/posts\/8723\/revisions\/27623"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media\/8725"}],"wp:attachment":[{"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/media?parent=8723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/categories?post=8723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/db-engineering-consulting.com\/en\/wp-json\/wp\/v2\/tags?post=8723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}