Dual-track upgrade Homburg embankment, Germany

The BIM pilot project “Homburg embankment” is part of the overall “Rhine-Main Plus” project in the Frankfurt (Main) central station.

  • 600 m long, dual-track trough construction with subsequent overbridge and an equally long retaining wall.

Scope of services:

  • Overall design management, BIM coordination of the technical disciplines in conjunction with the client’s BIM management
  • Building Information Modeling (BIM): 3-D survey, 3-D real-world modeling, visualization, 3-D modeling (geometric model), 3-D collision testing, planning coordination, 4-D modeling (presentation of the construction sequence), 5-D modeling (presentation of the cost development), object based quantity calculation, semiautomated specifications creation.
Background image - hands typing on keyboard Background image - hands typing on keyboard
Do not miss the latest news! Follow us