Three-track upgrade Emmerich–Oberhausen, Germany
Section of the freight corridor from Rotterdam to Genoa; line upgrade (third track) with conversion of the system changeover point at the German/Dutch border, conversion ofthe Oberhausen hub and numerous railroad crossingreplacement measures.
- 73 km long line
- Replacement of 55 railroad crossings with 38 bridges
Scope of services:
- Design, realization management and construction supervision,
- design review of the overhead line equipment and electrical power systems, waste analysis. ETCS Level 2 and GSM-R