New construction Aurachtal bridge, Germany

July 20, 2020 – 6:22 pm

New construction of an eleven-section concrete bridge in semi-integral design, rerouting of the existing line to 1,750 m, increase of the line speed, deconstruction of the old steel bridge.

  • 530 m length
  • 40 m height
  • 160 km/h in the area of the bridge

Scope of services:

Background image - hands typing on keyboard Background image - hands typing on keyboard
Do not miss the latest news! Follow us